AVAILABILITY ANALYSIS FOR A MULTI-COMPONENT SYSTEM WITH DIFFERENT K-OUT-OF-N:G WARM STANDBY SUBSYSTEMS SUBJECT TO SUSPENDED ANIMATION

被引:8
|
作者
Wang, Yu [1 ]
Guo, Linhan [1 ]
Wen, Meilin [1 ]
Yang, Yi [1 ]
机构
[1] Beihang Univ, Sch Reliabil & Syst Engn, Sci & Technol Reliabil & Environm Engn Lab, Beijing, Peoples R China
来源
EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY | 2019年 / 21卷 / 02期
基金
中国国家自然科学基金;
关键词
availability; multi-component series system; k-out-of-n:G warm standby subsystem; suspended animation; Markov process; REDUNDANT DEPENDENCY; DESIGN OPTIMIZATION; SERIES SYSTEMS; RELIABILITY;
D O I
10.17531/ein.2019.2.14
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Industrial equipment or systems are usually constructed as a multi-component series system with k-out-of-n:G subsystems to fulfill a specified function. As a common type of standby, warm standby is considered in the multi-component series system with k-out-of-n:G standby subsystems. When a subsystem fails, the non-failed subsystems are shut off and cannot fail, which is defined as suspended animation (SA). If the SA is ignored the non-failed subsystems are assumed to keep working in the SA time, which will cause inaccuracy in the availability analysis for the system. In this paper; we focus on the SA to construct an availability model for a multi-component series system with k-out-of-n:G warm standby subsystems. Multiple continuous time Markov chains are constructed to model the system availability. A Monte Carlo simulation has been carried out to verify our method. Several interesting findings are obtained. 1) The failure rates of subsystems with SA and their limits are derived. 2) The closed-form expressions for the stationary availability of the system and subsystems, mean time to failure, mean time to repair and .stationary failure frequency are obtained considering SA. 3) The system stationary availability is a monotone function for its parameters. 4) The SA effect on the stationary availability should be emphasized in two cases, one is both the value n/k and the failure rate of active components in a k-out-of-n subsystem are relatively large or small, the other is both the value of n/k and the repair rate are relatively small.
引用
收藏
页码:289 / 300
页数:12
相关论文
共 42 条
  • [31] Reliability assessment of multi-computer system consisting n clients and the k-out-of-n: G operation scheme with copula repair policy
    Rawal D.K.
    Sahani S.K.
    Singh V.V.
    Jibril A.
    Life Cycle Reliability and Safety Engineering, 2022, 11 (2) : 163 - 175
  • [32] Reliability analysis of a k-out-of-n:G system with general repair times and replaceable repair equipment
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    Liu, Hui
    QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2018, 15 (02): : 274 - 300
  • [33] Reliability analysis of k-out-of-n: G repairable systems considering common cause failure and multi-level maintenance strategy
    Dong, Qinglai
    Liu, Pin
    Jia, Xujie
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2024, 238 (01) : 44 - 59
  • [34] Transient Analysis of a k-out-of-n:G System with N-Policy, Repairmen's Multiple Vacations, and Redundant Dependency
    Wu, Wenqing
    Tang, Yinghui
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [35] Reliability evaluation of a k-out-of-n(G)-subsystem based multi-state system with common bus performance sharing
    Su, Peng
    Wang, Guanjun
    Duan, Fengjun
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 198
  • [36] Availability of a general k-out-of-n:G system with non-identical components considering shut-off rules using quasi-birth death process
    Moghaddass, Ramin
    Zuo, Ming J.
    Wang, Wenbin
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (04) : 489 - 496
  • [37] Reliability analysis and optimal redundancy for a satellite power supply system based on a new dynamic k-out-of-n: G model
    Xu, Dong
    Tian, Yubin
    Shi, Junbiao
    Wang, Dianpeng
    Zhang, Ming
    Li, Haijin
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2023, 236
  • [38] COMPUTATION AND PROFIT ANALYSIS OF A k-OUT-OF-n:G REPAIRABLE SYSTEM UNDER N-POLICY WITH MULTIPLE VACATIONS AND ONE REPLACEABLE REPAIR FACILITY
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    RAIRO-OPERATIONS RESEARCH, 2015, 49 (04) : 717 - 734
  • [39] Reliability Analysis and Machine Learning Prediction for a Repairable Load-Sharing K-Out-of-N plus W: G Power Supply System
    Gao, Shan
    IEEE ACCESS, 2024, 12 : 133183 - 133198
  • [40] Modeling and analysis of weighted-k-out-of-n: G system consisting of two different types of components
    Eryilmaz, Serkan
    Sarikaya, Kadir
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2014, 228 (03) : 265 - 271