Modelling and scheduling analysis of multi-cluster tools with residency constraints based on time constraint sets

被引:13
作者
Liu, Ming-Xiang [1 ]
Zhou, Bing-Hai [1 ]
机构
[1] Tongji Univ, Sch Mech Engn, Shanghai 200092, Peoples R China
基金
中国国家自然科学基金;
关键词
multi-cluster tools; residency constraints; modelling; scheduling; time constraint set; multiple wafer product types; STEADY-STATE THROUGHPUT; MULTICLUSTER TOOLS;
D O I
10.1080/00207543.2013.774490
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper is dedicated to the scheduling problem of multi-cluster tools with process module residency constraints and multiple wafer product types. The problem is formulated as a non-linear programming model based on a set of time constraint sets. An effective algorithm called the time constraint sets based (TCSB) algorithm is presented as a new method to schedule the transport modules to minimise the makespan of a number of wafers. In approach, time constraint sets are maintained for all the resources and necessary operations to exploit the remaining production capacities during the scheduling process. To validate the proposed algorithm on a broader basis, a series of simulation experiments are designed to compare our TCSB algorithm with the benchmark with regard to cluster factor, configuration flexibilities and the variation of the processing times and residency constraint times. The results indicate that the proposed TCSB algorithm gives optimal or near optimal scheduling solutions in most cases.
引用
收藏
页码:4835 / 4852
页数:18
相关论文
共 14 条
[1]  
Chan W.-K. V., 2010, 6 ANN IEEE C AUT SCI, P112
[2]   Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis [J].
Chan, Wai Kin Victor ;
Yi, Jingang ;
Ding, Shengwei .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) :5-16
[3]   Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part II: Tree-Like Topology Configurations [J].
Chan, Wai Kin Victor ;
Ding, Shengwei ;
Yi, Jingang ;
Song, Dezhen .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) :17-28
[4]   TEMPORAL CONSTRAINT NETWORKS [J].
DECHTER, R ;
MEIRI, I ;
PEARL, J .
ARTIFICIAL INTELLIGENCE, 1991, 49 (1-3) :61-95
[5]   Multicluster tools scheduling: An integrated event graph and network model approach [J].
Ding, Shengwei ;
Yi, Jingang ;
Zhang, Mike Tao .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (03) :339-351
[6]  
Kyungsu Park, 2010, 2010 8th IEEE International Conference on Control and Automation (ICCA 2010), P1481, DOI 10.1109/ICCA.2010.5524415
[7]   SINGLE-WAFER CLUSTER TOOL PERFORMANCE - AN ANALYSIS OF THROUGHPUT [J].
PERKINSON, TL ;
MCLARTY, PK ;
GYURCSIK, RS ;
CAVIN, RK .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1994, 7 (03) :369-373
[8]   An optimal residency-aware scheduling technique for cluster tools with buffer module [J].
Rostami, S ;
Hamidzadeh, B .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2004, 17 (01) :68-73
[9]   Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints [J].
Rostami, S ;
Hamidzadeh, B .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2002, 15 (03) :341-349
[10]   An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints [J].
Rostami, S ;
Hamidzadeh, B ;
Camporese, D .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (05) :609-618