Risk factors for delays in rail investments implemented in the Design & Build contracts

被引:3
作者
Kowalski, Jan [1 ]
Polonski, Mieczyslaw [1 ]
Lendo-Siwicka, Marzena [1 ]
机构
[1] WULS, SGGW, Fac Civil & Environm Engn, Ul Nowoursynowska 159, PL-02787 Warsaw, Poland
来源
64THSCIENTIFIC CONFERENCE OF THE COMMITTEE FOR CIVIL ENGINEERING OF THE POLISH ACADEMY OF SCIENCES AND THE SCIENCE COMMITTEE OF THE POLISH ASSOCIATION OF CIVIL ENGINEERS (PZITB) (KRYNICA 2018) | 2019年 / 262卷
关键词
MANAGEMENT;
D O I
10.1051/matecconf/201926207007
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The article presents the results of nationwide surveys on the causes of delays during the implementation of rail investments in Poland, carried out in the Design & Build formula for the design stage. The study did not examine typical causes of threats to general construction works, only those that result from the specifics of works at rail facilities. The survey was conducted with the participation of experts from various industries, representing all the key participants in the investment process. The selection of experts was limited to people who have extensive professional experience in implementing rail projects. Statistical analyzes were performed using the IBM SPSS Statistics 23 package. It was used to test chi 2 and a one-way repeated measures ANOVA. The greatest threats to the deadlines for the implementation of rail investments in Poland, which were indicated by the respondents as the delay threats of a high importance are: negligence in the preparation of tender documents and problems with obtaining current maps for project purposes from rail geodesic centers. The research results can be helpful when planning future rail investments, calculating the necessary time reserves and increasing the reliability of the set dates of their completion.
引用
收藏
页数:6
相关论文
共 12 条
[1]   Financial risk estimation in construction contracts [J].
Dziadosz, Agnieszka ;
Tomczyk, Andrzej ;
Kaplinski, Oleg .
INNOVATIVE SOLUTIONS IN CONSTRUCTION ENGINEERING AND MANAGEMENT: FLEXIBLE APPROACH, 2015, 122 :120-128
[2]   Project risk time management - a proposed model and a case study in the construction industry [J].
Gladysz, Barbara ;
Skorupka, Dariusz ;
Kuchta, Dorota ;
Duchaczek, Artur .
CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, CENTERIS/PROJMAN / HCIST 2015, 2015, 64 :24-31
[3]   Risk Management of Construction Works by Means of the Utility Theory: a Case Study [J].
Kaplinski, Oleg .
MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2013, 57 :533-539
[4]  
Lendo-Siwicka M., 2016, MAT BUDOWLANE, V6, P154
[5]   Quality risk management model for railway construction projects [J].
Li Qing ;
Liu Rengkui ;
Zhang Jun ;
Sun Quanxin .
2014 INTERNATIONAL SYMPOSIUM ON SAFETY SCIENCE AND TECHNOLOGY, 2015, 84 :195-203
[6]  
Ploywarin S, 2014, INT J MANAG SCI BUS, V3, P2226
[7]  
Polonski M., 2016, MAT BUDOWLANE, V6, P162
[8]  
Polonski M., 2017, Technical Transactions, V5, P47
[9]   IDENTIFICATION OF RISK FACTORS OF DEVELOPMENT AND OPERATION OF ROADS IN THE LIGHT OF SURVEYING WORK [J].
Skorupka, D. ;
Kowacka, M. .
ARCHIVES OF CIVIL ENGINEERING, 2016, 62 (02) :183-190
[10]  
Sunduck D., 2000, PE IATSS RES, V24, P53