Digital Transformation Model for the Reduction of Time Taken for Document Management with a Technology Adoption Approach for Construction SMEs

被引:0
作者
Lazaro-Aleman, Waldir [1 ]
Manrique-Galdos, Fernando [1 ]
Ramirez-Valdivia, Cesar [1 ]
Raymundo-Ibanez, Carlos [2 ]
Moguerza, Javier M. [3 ]
机构
[1] Univ Peruana Ciencias Aplicadas UPC, Ingeneria Gest Empresarial, Lima, Peru
[2] Univ Peruana Ciencias Aplicadas UPC, Direcc Invest, Lima, Peru
[3] Univ Rey Juan Carlos, Escuela Super Ingn Informat, Madrid, Spain
来源
2020 9TH INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY AND MANAGEMENT (ICITM 2020) | 2020年
关键词
BIM; construction; digital transformation; document management; reprocesses; QUALITY; QFD;
D O I
10.1109/icitm48982.2020.9080390
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Currently, the lack of time and cost optimization in processes is a factor that affects 65% of companies in the construction sector as they continue to use traditional methods for several company processes, such as document processing. Therefore, the contribution of this research is the reduction of document approval time for the parties involved by 75% through the digital transformation of medium-sized companies in the construction sector using the building information modeling (BIM) methodology, applying three stages: planning, where the context of the company is analyzed and initial data are obtained; execution, where the necessary tools are used to solve the problem; and continuous improvement, where the data and results will be explained and the effectiveness of the project will be demonstrated. Consequently, a pilot test was carried out in one of the projects of a company called ABC S.A. to collect information, data, and results related to the efficiency and the adoption level of the BIM for the purpose of validating the reduction of time taken for document processing, reduction of costs by 40%, and for its application in various companies of the same sector. The results showed that the digital transformation of document management reduced review time and improved worker performance.
引用
收藏
页码:1 / 5
页数:5
相关论文
共 13 条
  • [1] Simulating the dynamics of social agents and information flows in BIM-based design
    Al Hattab, Malak
    Hamzeh, Farook
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 92 : 1 - 22
  • [2] Lean Manufacturing Model for the Reduction of Production Times and Reduction of the Returns of Defective Items in Textile Industry
    Andrade, Yanira
    Cardenas, Leslie
    Viacava, Gino
    Raymundo, Carlos
    Dominguez, Francisco
    [J]. ADVANCES IN DESIGN FOR INCLUSION, 2020, 954 : 387 - 398
  • [3] Internal customer satisfaction improvement with QFD technique
    Camgoz-Akdag, Hatice
    Imer, H. Pinar
    Ergin, K. Nazli
    [J]. BUSINESS PROCESS MANAGEMENT JOURNAL, 2016, 22 (05) : 957 - 968
  • [4] Quality function deployment in failure recovery and prevention
    Chen, Hsi-Tien
    [J]. SERVICE INDUSTRIES JOURNAL, 2016, 36 (13-14) : 615 - 637
  • [5] Implementation of BIM in Small Home-Building Businesses
    Garcia, Angelo Joseph
    Mollaoglu, Sinem
    Syal, Matt
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2018, 23 (02)
  • [6] LeMahieu PG, 2017, QUAL ASSUR EDUC, V25, P91, DOI 10.1108/QAE-12-2016-0082
  • [7] Construction quality management based on a collaborative system using BIM and indoor positioning
    Ma, Zhiliang
    Cai, Shiyao
    Mao, Na
    Yang, Qiliang
    Feng, Junguo
    Wang, Pengyi
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 92 : 35 - 45
  • [8] National Institute for Statistics and Informatics, 2016, PERU IT COMMUNICATIO
  • [9] Pomasoncco A., IMCIC2019 10TH INT M, V2, P75
  • [10] An empirical study on lean awareness and potential for lean implementations in Qatar industries
    Salem, Roba
    Musharavati, Farayi
    Hamouda, Abdel Magid
    Al-Khalifa, Khalifa N.
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 82 (9-12) : 1607 - 1625