An AHP (Analytic Hierarchy Process)/ANP (Analytic Network Process)-based multi-criteria decision approach for the selection of solar-thermal power plant investment projects

被引:239
作者
Aragones-Beltran, Pablo [1 ]
Chaparro-Gonzalez, Fidel [2 ]
Pastor-Ferrando, Juan-Pascual [3 ]
Pla-Rubio, Andrea [3 ]
机构
[1] Univ Politecn Valencia, INGENIO CSIC UPV, Valencia 46022, Spain
[2] Univ Politecn Valencia, Dept Business, Valencia 46022, Spain
[3] Univ Politecn Valencia, Dept Engn Projects, Valencia 46022, Spain
关键词
AHP (Analytic hierarchy process); ANP (Analytic network process); Solar-thermal power projects; MUNICIPAL SOLID-WASTE; ECONOMIC-ANALYSIS; GENERATION; INDIA;
D O I
10.1016/j.energy.2013.12.016
中图分类号
O414.1 [热力学];
学科分类号
摘要
In this paper the AHP (Analytic Hierarchy Process) and the ANP (Analytic Network Process) are applied to help the managing board of an important Spanish solar power investment company to decide whether to invest in a particular solar-thermal power plant project and, if so, to determine the order of priority of the projects in the company's portfolio. Project management goes through a long process, from obtaining the required construction permits and authorizations, negotiating with different stakeholders, complying with complex legal regulations, to solving the technical problems associated with plant construction and distribution of the energy generated. The whole process involves high engineering costs. The decision approach proposed in this paper consists of three phases. In the first two phases, the managing board must decide whether to accept or reject a project according to a set of criteria previously identified by the technical team. The third phase consists of establishing a priority order among the projects that have proven to be economically profitable based on project risk levels and execution time delays. This work analyzes the criteria that should be taken into account to accept or reject proposals for investment, as well as the risks used to prioritize some projects over others. (C) 2013 Elsevier Ltd. All rights reserved.
引用
收藏
页码:222 / 238
页数:17
相关论文
共 42 条
  • [1] [Anonymous], 2013, BOE
  • [2] [Anonymous], 2011, Plan de Energias Renovables
  • [3] An ANP-based approach for the selection of photovoltaic solar power plant investment projects
    Aragones-Beltran, P.
    Chaparro-Gonzalez, F.
    Pastor-Ferrando, J. P.
    Rodriguez-Pozo, F.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2010, 14 (01) : 249 - 264
  • [4] An Analytic Network Process approach for siting a municipal solid waste plant in the Metropolitan Area of Valencia (Spain)
    Aragones-Beltran, Pablo
    Pascual Pastor-Ferrando, Juan
    Garcia-Garcia, Fernando
    Pascual-Agullo, Amadeo
    [J]. JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2010, 91 (05) : 1071 - 1086
  • [5] Evaluation of power plants in Turkey using Analytic Network Process (ANP)
    Atmaca, Ediz
    Basar, Hasan Burak
    [J]. ENERGY, 2012, 44 (01) : 555 - 563
  • [6] Belton Valerie., 2002, Multiple Criteria Decision Analysis: An Integrated Approach, DOI DOI 10.1007/978-1-4615-1495-4
  • [7] Bouyssou DT., 2000, Evaluation and Decision Model. A Critical Perspective
  • [8] HOW TO SELECT AND HOW TO RANK PROJECTS - THE PROMETHEE METHOD
    BRANS, JP
    VINCKE, P
    MARESCHAL, B
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (02) : 228 - 238
  • [9] Economic impact of solar thermal electricity deployment in Spain
    Caldes, N.
    Varela, M.
    Santamaria, M.
    Saez, R.
    [J]. ENERGY POLICY, 2009, 37 (05) : 1628 - 1636
  • [10] Multi-criteria analysis for the selection of space heating systems in an industrial building
    Chinese, Damiana
    Nardin, Gioacchino
    Saro, Onorio
    [J]. ENERGY, 2011, 36 (01) : 556 - 565