共 18 条
- [1] Ahmad I., 1988, J MANAGEMENT ENG ASC, V4, P229
- [2] Akintoye A., 2000, Construction Management Economics, V18, P77, DOI DOI 10.1080/014461900370979
- [3] Key factors in bid reasoning model [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (05): : 349 - 357
- [4] Utility-theory model for markup decisions [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (02): : 119 - 124
- [6] Dulaimi M. F., 2002, CONSTRUCTION MANAGEM, V20, P601, DOI DOI 10.1080/01446190210159890
- [7] Competitive bidding strategy model and software system for bid preparation [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (01): : 1 - 10
- [8] Kish L., 1965, Survey Sampling, P45
- [9] Li H., 1999, Construction Management and Economics, V17, P169, DOI [10.1080/014461999371664, DOI 10.1080/014461999371664]
- [10] Shash A., 1992, Construction Management and Economics, V10, P415