Integrated finite strip analysis for long-span cable-stayed bridges

被引:10
|
作者
Naderian, Hamidreza [1 ]
Cheung, Moe M. S. [2 ,3 ]
Shen, Zhenyuan [2 ]
Dragomirescu, Elena [1 ]
机构
[1] Univ Ottawa, Dept Civil & Environm Engn, Ottawa, ON K1N 6N5, Canada
[2] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Hong Kong, Hong Kong, Peoples R China
[3] Sichuan Univ, Western China Earthquake & Hazards Mitigat Res Ct, Chengdu 610064, Peoples R China
关键词
Long-span bridge; Cable-stayed bridge; Integrated finite strip method; Column strip; Cable strip; Kap Shui Mun Bridge; BOX-GIRDER BRIDGES;
D O I
10.1016/j.compstruc.2015.05.031
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
An integrated finite strip discretization scheme is proposed for modeling long-span cable-stayed bridges. So-called column strips and cable strips model the towers and cables respectively. Also, the structural interactions between different components can be considered in the analysis by defining so-called transition sections. The static and free vibration analyses are performed for Kap Shui Mun Bridge by the integrated finite strip method. The numerical results are verified against other methods. The proposed solution proves to be very efficient in yielding accurate results, in a minimum amount of time while the convergence of the method is still very high. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:82 / 97
页数:16
相关论文
共 50 条
  • [41] Three-dimensional finite element modeling of a long-span cable-stayed bridge for local stress analysis
    Lertsima, C
    Chaisomphob, T
    Yamaguchi, E
    STRUCTURAL ENGINEERING AND MECHANICS, 2004, 18 (01) : 113 - 124
  • [42] Simulation and analysis of long-span cable-stayed bridge during construction based on ANSYS
    Wu, Fangwen
    Xue, Chengfeng
    ICMS2010: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION, VOL 1: ENGINEERING COMPUTATION AND FINITE ELEMENT ANALYSIS, 2010, : 341 - 345
  • [43] Extreme response to traffic of long-span cable-stayed bridges: comparison with existing traffic load models
    Wang, Xuejing
    Ruan, Xin
    Casas, Joan R.
    Zhang, Mingyang
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2024,
  • [44] Theoretical and Experimental Study on Cable-to-girder Anchorages in Long-span Cable-stayed Bridges with Steel Box Girder
    Wei, Xing
    Li, Jun
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 1315 - 1318
  • [45] Deformation monitoring and analysis of a long-span cable-stayed bridge during strong typhoons
    Mao, Jianxiao
    Wang, Hao
    Xu, Yichao
    Li, Hang
    ADVANCES IN BRIDGE ENGINEERING, 2020, 1 (01):
  • [46] Study of super long span cable-stayed bridges with CFRP components
    Xiong, Wen
    Cai, C. S.
    Zhang, Yin
    Xiao, Rucheng
    ENGINEERING STRUCTURES, 2011, 33 (02) : 330 - 343
  • [47] Temperature monitoring and analysis of a long-span cable-stayed bridge during construction period
    Mei, Xiudao
    Lu, Yiyan
    Shi, Jing
    STRUCTURAL MONITORING AND MAINTENANCE, 2021, 8 (02): : 203 - 220
  • [48] Puqian Bridge: A Long-Span Cable-Stayed Bridge in a Meizoseismal Area
    Wu, Jingwu
    Xia, Ye
    Sun, Pingkuan
    Yu, Deen
    Sun, Limin
    STRUCTURAL ENGINEERING INTERNATIONAL, 2023, 33 (01) : 64 - 67
  • [49] Mechanisms of thermally induced deflection of a long-span cable-stayed bridge
    Zhou, Yi
    Sun, Limin
    Peng, Zhijian
    SMART STRUCTURES AND SYSTEMS, 2015, 15 (03) : 505 - 522
  • [50] Progressive Collapse Behavior of a Long-Span Cable-Stayed Bridge Induced by Cable Loss
    Chen, Qian
    Wang, Hongfan
    El-Tawil, Sherif
    Agrawal, Anil K.
    Bhattacharya, Baidurya
    Wong, Waider
    JOURNAL OF BRIDGE ENGINEERING, 2023, 28 (09)