Optimization of the Wind Farm Layout by Repowering the old Wind Farm and integrating Solar Power Plants: A Case Study

被引:0
作者
Boopathi, K. [1 ]
Ramaswamy, S. [1 ]
Kirubaharan, V [1 ]
Bastin, J. [2 ]
Devi, A. Shobana [2 ]
Kanagavel, P. [2 ]
Balaraman, K. [2 ]
机构
[1] Gandhigram Rural Inst Deemed Univ, Dindigul, Tamil Nadu, India
[2] Natl Inst Wind Energy, Chennai, Tamil Nadu, India
来源
INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH | 2020年 / 10卷 / 03期
关键词
Repowering; Hybrid Energy System; Capacity Utilization Factor; Wind Turbines; ENERGY; SYSTEM;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Most of the wind farms established in Tamil Nadu, India, in the early 2000s have reached the end of their targeted useful life. These turbines are colonized potentially wind-rich regions and either need to be dismantled or repowered. They are embedded in a 5Dx 7D arrangement, and large areas of underutilized land lie between them. The repowering of old turbines and the development of solar power plants on underutilized land between them would help to optimize the usage of existing infrastructure and natural resources. The primary purpose of this study is to support sustainable growth in the generation of wind turbines by repowering old wind turbines. The 6 Mega Watt (MW) old wind farm in Kayathar, Tuticorin District, Tamil Nadu, was chosen as the region of interest for this study. Based on data collection from January 2016 to December 2016, an average annual wind speed of 6.92 m/s at 120 meters and an annual Global Horizontal Irradiation (GHI) of 4.92-5.21 kWh/m2 /day was observed. Energy estimates have been made using the Wind Atlas Analysis and Application Program (WAsP) and the PVSyst software. Analytical results demonstrate that when modern wind turbines were supplemented with older, largercapacity wind turbines, overall power generation increased from 3.50 Giga Watt-hour (GWh) to 40GWh at the P90 confidence level with a ratio of 1:1.25 to 1:3-fold generation ratio and an energy yield ratio of 1:1.61 to 1:7.82-fold. The combined repowered wind turbines with the integrated solar power system have demonstrated substantial increases in annual energy production in the vicinity of 38-76 GWh / year, suggesting the use of hybrid electricity as a reliable source
引用
收藏
页码:1287 / 1301
页数:15
相关论文
共 50 条
  • [41] Wind farm hub height optimization
    Vasel-Be-Hagh, Ahmadreza
    Archer, Cristina L.
    APPLIED ENERGY, 2017, 195 : 905 - 921
  • [42] Study on Reactive Power Compesation of Single Wind Farm
    Li, Yue
    Liu, Baozhu
    PROGRESS IN RENEWABLE AND SUSTAINABLE ENERGY, PTS 1 AND 2, 2013, 608-609 : 573 - 578
  • [43] Power dispatch assessment of a wind farm and a hydropower plant: A case study in Argentina
    Ignacio Levieux, Luis
    Inthamoussou, Fernando A.
    De Battista, Hernan
    ENERGY CONVERSION AND MANAGEMENT, 2019, 180 : 391 - 400
  • [44] Improved Formulation for the Optimization of Wind Turbine Placement in a Wind Farm
    Geem, Zong Woo
    Hong, Junhee
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [45] Wind farm layout optimization through optimal wind turbine placement using a hybrid particle swarm optimization and genetic algorithm
    Qureshi, Tarique Anwar
    Warudkar, Vilas
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2023, 30 (31) : 77436 - 77452
  • [46] Repowering of Wind Farms - a Case Study
    Nivedh, B. S.
    Devi, R. P. Kumudini
    Sreevalsan, E.
    WIND ENGINEERING, 2013, 37 (02) : 137 - 150
  • [47] A Multi-Local Search-Based SHADE for Wind Farm Layout Optimization
    Yang, Yifei
    Tao, Sichen
    Li, Haotian
    Yang, Haichuan
    Tang, Zheng
    ELECTRONICS, 2024, 13 (16)
  • [48] Wind farm layout optimization in complex terrain based on CFD and IGA-PSO
    Hu, Weicheng
    Yang, Qingshan
    Yuan, Ziting
    Yang, Fucheng
    ENERGY, 2024, 288
  • [49] Multi-objective lightning search algorithm applied to wind farm layout optimization
    Moreno, Sinvaldo Rodrigues
    Pierezan, Juliano
    Coelho, Leandro dos Santos
    Mariani, Viviana Cocco
    ENERGY, 2021, 216
  • [50] Sensitivity analysis of criteria to optimize wind farm localizing: A case study
    Rezaei, Mostafa
    Mostafaeipour, Ali
    Saidi-Mehrabad, Mohammad
    Qolipour, Mojtaba
    Sedaghat, Ahmad
    Arabnia, Hamid Reza
    Momeni, Mozhgan
    WIND ENGINEERING, 2020, 44 (03) : 294 - 312