Optimization of the Wind Farm Layout by Repowering the old Wind Farm and integrating Solar Power Plants: A Case Study

被引:0
作者
Boopathi, K. [1 ]
Ramaswamy, S. [1 ]
Kirubaharan, V [1 ]
Bastin, J. [2 ]
Devi, A. Shobana [2 ]
Kanagavel, P. [2 ]
Balaraman, K. [2 ]
机构
[1] Gandhigram Rural Inst Deemed Univ, Dindigul, Tamil Nadu, India
[2] Natl Inst Wind Energy, Chennai, Tamil Nadu, India
来源
INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH | 2020年 / 10卷 / 03期
关键词
Repowering; Hybrid Energy System; Capacity Utilization Factor; Wind Turbines; ENERGY; SYSTEM;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Most of the wind farms established in Tamil Nadu, India, in the early 2000s have reached the end of their targeted useful life. These turbines are colonized potentially wind-rich regions and either need to be dismantled or repowered. They are embedded in a 5Dx 7D arrangement, and large areas of underutilized land lie between them. The repowering of old turbines and the development of solar power plants on underutilized land between them would help to optimize the usage of existing infrastructure and natural resources. The primary purpose of this study is to support sustainable growth in the generation of wind turbines by repowering old wind turbines. The 6 Mega Watt (MW) old wind farm in Kayathar, Tuticorin District, Tamil Nadu, was chosen as the region of interest for this study. Based on data collection from January 2016 to December 2016, an average annual wind speed of 6.92 m/s at 120 meters and an annual Global Horizontal Irradiation (GHI) of 4.92-5.21 kWh/m2 /day was observed. Energy estimates have been made using the Wind Atlas Analysis and Application Program (WAsP) and the PVSyst software. Analytical results demonstrate that when modern wind turbines were supplemented with older, largercapacity wind turbines, overall power generation increased from 3.50 Giga Watt-hour (GWh) to 40GWh at the P90 confidence level with a ratio of 1:1.25 to 1:3-fold generation ratio and an energy yield ratio of 1:1.61 to 1:7.82-fold. The combined repowered wind turbines with the integrated solar power system have demonstrated substantial increases in annual energy production in the vicinity of 38-76 GWh / year, suggesting the use of hybrid electricity as a reliable source
引用
收藏
页码:1287 / 1301
页数:15
相关论文
共 50 条
  • [31] Multi-factorial methodology for Wind Power Plant repowering optimization: A Spanish case study
    Garcia, Isabel C. Gil
    Fernandez-Guillamon, Ana
    Garcia-Cascales, M. Socorro
    Molina-Garcia, Angel
    ENERGY REPORTS, 2024, 11 : 179 - 196
  • [32] Wind resource assessment and optimization of wind farm layout at Kayathar, Tamil Nadu, India using WAsP
    Rajadurai Mani Jabez
    Kirubakaran Victor
    Discover Applied Sciences, 7 (6)
  • [33] Harmonised global datasets of wind and solar farm locations and power
    Dunnett, Sebastian
    Sorichetta, Alessandro
    Taylor, Gail
    Eigenbrod, Felix
    SCIENTIFIC DATA, 2020, 7 (01)
  • [34] Comparative analysis and improvement of grid-based wind farm layout optimization
    Gualtieri, Giovanni
    ENERGY CONVERSION AND MANAGEMENT, 2020, 208 (208)
  • [35] Exploiting Hardware and Software Advances for Quadratic Models of Wind Farm Layout Optimization
    Senderovich, Arik
    Zhang, Jiachen
    Cohen, Eldan
    Beck, J. Christopher
    IEEE ACCESS, 2022, 10 : 78044 - 78055
  • [36] Study on power collaborative optimization of wind farm based on yaw wake model
    Li X.
    Xu J.
    Zhu R.
    Li G.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2022, 43 (10): : 144 - 151
  • [37] Failures Analysis of Wind Turbines: Case Study of a Chinese Wind Farm
    Su, Chun
    Yang, Yang
    Wang, Xiaolin
    Hu, Zhaoyong
    2016 PROGNOSTICS AND SYSTEM HEALTH MANAGEMENT CONFERENCE (PHM-CHENGDU), 2016,
  • [38] Layout optimization of offshore wind farm considering spatially inhomogeneous wave loads
    Ti Zilong
    Wei, Deng Xiao
    APPLIED ENERGY, 2022, 306
  • [39] Competitive Elimination Improved Differential Evolution for Wind Farm Layout Optimization Problems
    Tao, Sichen
    Yang, Yifei
    Zhao, Ruihan
    Todo, Hiroyoshi
    Tang, Zheng
    MATHEMATICS, 2024, 12 (23)
  • [40] INVESTIGATION OF OFFSHORE-WIND-FARM LAYOUT OPTIMIZATION UNDER GEOMETRICAL CONSTRAINTS
    Zhang Z.
    Guo N.
    Yi K.
    Li J.
    Mu J.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2023, 44 (02): : 116 - 122