Optimization of the Wind Farm Layout by Repowering the old Wind Farm and integrating Solar Power Plants: A Case Study

被引:0
作者
Boopathi, K. [1 ]
Ramaswamy, S. [1 ]
Kirubaharan, V [1 ]
Bastin, J. [2 ]
Devi, A. Shobana [2 ]
Kanagavel, P. [2 ]
Balaraman, K. [2 ]
机构
[1] Gandhigram Rural Inst Deemed Univ, Dindigul, Tamil Nadu, India
[2] Natl Inst Wind Energy, Chennai, Tamil Nadu, India
来源
INTERNATIONAL JOURNAL OF RENEWABLE ENERGY RESEARCH | 2020年 / 10卷 / 03期
关键词
Repowering; Hybrid Energy System; Capacity Utilization Factor; Wind Turbines; ENERGY; SYSTEM;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Most of the wind farms established in Tamil Nadu, India, in the early 2000s have reached the end of their targeted useful life. These turbines are colonized potentially wind-rich regions and either need to be dismantled or repowered. They are embedded in a 5Dx 7D arrangement, and large areas of underutilized land lie between them. The repowering of old turbines and the development of solar power plants on underutilized land between them would help to optimize the usage of existing infrastructure and natural resources. The primary purpose of this study is to support sustainable growth in the generation of wind turbines by repowering old wind turbines. The 6 Mega Watt (MW) old wind farm in Kayathar, Tuticorin District, Tamil Nadu, was chosen as the region of interest for this study. Based on data collection from January 2016 to December 2016, an average annual wind speed of 6.92 m/s at 120 meters and an annual Global Horizontal Irradiation (GHI) of 4.92-5.21 kWh/m2 /day was observed. Energy estimates have been made using the Wind Atlas Analysis and Application Program (WAsP) and the PVSyst software. Analytical results demonstrate that when modern wind turbines were supplemented with older, largercapacity wind turbines, overall power generation increased from 3.50 Giga Watt-hour (GWh) to 40GWh at the P90 confidence level with a ratio of 1:1.25 to 1:3-fold generation ratio and an energy yield ratio of 1:1.61 to 1:7.82-fold. The combined repowered wind turbines with the integrated solar power system have demonstrated substantial increases in annual energy production in the vicinity of 38-76 GWh / year, suggesting the use of hybrid electricity as a reliable source
引用
收藏
页码:1287 / 1301
页数:15
相关论文
共 50 条
  • [1] Offshore wind farm repowering optimization
    Hou, Peng
    Enevoldsen, Peter
    Hu, Weihao
    Chen, Cong
    Chen, Zhe
    APPLIED ENERGY, 2017, 208 : 834 - 844
  • [2] Wind Farm Layout Optimization with Different Hub Heights in Manjil Wind Farm Using Particle Swarm Optimization
    Yeghikian, Menova
    Ahmadi, Abolfazl
    Dashti, Reza
    Esmaeilion, Farbod
    Mahmoudan, Alireza
    Hoseinzadeh, Siamak
    Garcia, Davide Astiaso
    APPLIED SCIENCES-BASEL, 2021, 11 (20):
  • [3] Simulated Annealing Algorithm for Wind Farm Layout Optimization: A Benchmark Study
    Yang, Kyoungboo
    Cho, Kyungho
    ENERGIES, 2019, 12 (23)
  • [4] Wind farm layout optimization for wake effect uniformity
    Yang, Kyoungboo
    Kwak, Gyeongil
    Cho, Kyungho
    Huh, Jongchul
    ENERGY, 2019, 183 : 983 - 995
  • [5] Investigation into offshore wind farm repowering optimization in Hong Kong
    Sun, Haiying
    Gao, Xiaoxia
    Yang, Hongxing
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2019, 14 (02) : 302 - 311
  • [6] Economic investigation of repowering of the existing wind farms with hybrid wind and solar power plants: a case study
    Boopathi, K.
    Ramaswamy, S.
    Kirubakaran, V.
    Uma, K.
    Saravanan, G.
    Thyagaraj, S.
    Balaraman, K.
    INTERNATIONAL JOURNAL OF ENERGY AND ENVIRONMENTAL ENGINEERING, 2021, 12 (04) : 855 - 871
  • [7] Economic investigation of repowering of the existing wind farms with hybrid wind and solar power plants: a case study
    K. Boopathi
    S. Ramaswamy
    V. Kirubakaran
    K. Uma
    G. Saravanan
    S. Thyagaraj
    K. Balaraman
    International Journal of Energy and Environmental Engineering, 2021, 12 : 855 - 871
  • [8] Life cycle assessment of a wind farm repowering process
    Martinez, E.
    Latorre-Biel, J. I.
    Jimenez, E.
    Sanz, F.
    Blanco, J.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 93 : 260 - 271
  • [9] Wind farm layout using biogeography based optimization
    Bansal, Jagdish Chand
    Farswan, Pushpa
    RENEWABLE ENERGY, 2017, 107 : 386 - 402
  • [10] Introducing Multi-Criteria Decision Analysis for Wind Farm Repowering A Case Study on Gotland
    Bezbradica, Marko
    Kerkvliet, Hans
    Borbolla, Ivan Montenegro
    Lehtimaki, Pyry
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE MULTIDISCIPLINARY ENGINEERING DESIGN OPTIMIZATION (MEDO), 2016,