A global MILP model for FMS scheduling

被引:32
作者
Liu, JY [1 ]
MacCarthy, BL [1 ]
机构
[1] UNIV NOTTINGHAM,DEPT MFG ENGN & OPERAT MANAGEMENT,NOTTINGHAM NG7 2RD,ENGLAND
关键词
integer programming; flexible manufacturing systems; scheduling theory;
D O I
10.1016/S0377-2217(96)00055-0
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Flexible manufacturing systems (FMS) require intelligent scheduling strategies to achieve their principal benefit - combining high flexibility with high productivity. A mixed-integer linear programming model (MILP) is presented here for FMS scheduling. The model takes a global view of the problem and specifically takes into account constraints on storage and transportation. Both of these constrained resources are critical for practical FMS scheduling problems and are difficult to model. The MILP model is explained and justified and its complexity is discussed. Two heuristic procedures are developed, based on an analysis of the global MILP model. Computational results are presented comparing the performance of the different solution strategies. The development of iterative global heuristics based on mathematical programming formulations is advocated for a wide class of FMS scheduling problems. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:441 / 453
页数:13
相关论文
共 20 条
[1]  
Araque J. R., 1994, Annals of Operations Research, V50, P37, DOI 10.1007/BF02085634
[2]   NEW TRENDS IN MACHINE SCHEDULING [J].
BLAZEWICZ, J ;
FINKE, G ;
HAUPT, R ;
SCHMIDT, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) :303-317
[3]   EFFECTS OF LOADING AND ROUTEING DECISIONS ON PERFORMANCE OF FLEXIBLE MANUFACTURING SYSTEMS [J].
CHEN, IJ ;
CHUNG, CH .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (11) :2209-2225
[4]   MULTIOBJECTIVE DECISION-MAKING APPROACH FOR DETERMINING ALTERNATE ROUTING IN A FLEXIBLE MANUFACTURING SYSTEM [J].
GANGAN, S ;
KHATOR, SK ;
BABU, AJG .
COMPUTERS & INDUSTRIAL ENGINEERING, 1987, 13 (1-4) :112-117
[5]   A MIXED INTEGER-PROGRAM FOR LOADING AND SCHEDULING MULTIPLE FLEXIBLE MANUFACTURING CELLS [J].
GREENE, TJ ;
SADOWSKI, RP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 24 (03) :379-386
[6]   SOLVING AIRLINE CREW SCHEDULING PROBLEMS BY BRANCH-AND-CUT [J].
HOFFMAN, KL ;
PADBERG, M .
MANAGEMENT SCIENCE, 1993, 39 (06) :657-682
[7]  
HUTCHISON J, 1990, J OPERATIONS MANAGEM, V9, P335
[8]  
KUSIAK A, 1985, FLEXIBLE MANUFACTURI, P119
[9]   CONCURRENT ROUTING, SEQUENCING, AND SETUPS FOR A 2-MACHINE FLEXIBLE MANUFACTURING CELL [J].
LEE, EJ ;
MIRCHANDANI, PB .
IEEE JOURNAL OF ROBOTICS AND AUTOMATION, 1988, 4 (03) :256-264
[10]   The classification of FMS scheduling problems [J].
Liu, J ;
MacCarthy, BL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (03) :647-656