A model for optimal scheduling of hydro thermal systems including pumped-storage and wind power

被引:70
作者
Helseth, Arild [1 ]
Gjelsvik, Anders [1 ]
Mo, Birger [1 ]
Linnet, Ulfar [2 ]
机构
[1] SINTEF Energy Res, N-7465 Trondheim, Norway
[2] Landsvirkjun, IS-103 Reykjavik, Iceland
关键词
hydrothermal power systems; load flow; power generation scheduling; pumped-storage power stations; reservoirs; wind power plants; Icelandic power system; fine time resolution; medium-term hydrothermal generation scheduling; long-term hydrothermal generation scheduling; generating units; start-up costs; linearised representation; power flow constraints; stochastic variables; hydropower reservoirs; multiple hydro reservoirs; wind power; pumped-storage; STOCHASTIC OPTIMIZATION; GENERATION; PROGRAMS;
D O I
10.1049/iet-gtd.2012.0639
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This study describes a model for optimal scheduling of hydro thermal systems with multiple hydro reservoirs. Inflow to hydropower reservoirs, wind power and exogenously given prices are treated as stochastic variables. Power flow constraints are included through a linearised power flow model. A linearised representation of start-up costs for generating units and pumps is provided. The model is well suited for medium- and long-term hydro thermal generation scheduling and has the capability of capturing detailed system constraints by using a fine time resolution. The presented model is tested on a realistic representation of the Icelandic power system, considering some potential future system extensions.
引用
收藏
页码:1426 / 1434
页数:9
相关论文
共 21 条
[1]  
[Anonymous], 2013, Power generation, operation, and control
[2]  
[Anonymous], INT SER OPER RES MAN
[3]  
Birge JR, 2011, SPRINGER SER OPER RE, P3, DOI 10.1007/978-1-4614-0237-4
[4]   A computational study of a stochastic optimization model for long term hydrothermal scheduling [J].
de Matos, Vitor Luiz ;
Finardi, Erlon Cristian .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2012, 43 (01) :1443-1452
[5]   A Dynamic Piecewise Linear Model for DC Transmission Losses in Optimal Scheduling Problems [J].
dos Santos, Tiago Norbiato ;
Diniz, Andre Luiz .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (02) :508-519
[6]   Long-term optimal allocation of hydro generation for a price-maker company in a competitive market: latest developments and a stochastic dual dynamic programming approach [J].
Flach, B. C. ;
Barroso, L. A. ;
Pereira, M. V. F. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2010, 4 (02) :299-314
[7]   Generation scheduling in a deregulated system. The Norwegian case - Discussion [J].
Fotuhi-Firuzabad, M ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (01) :81-81
[8]  
Gjelsvik A, 2010, ENERG SYST, P33, DOI 10.1007/978-3-642-02493-1_2
[9]   STOCHASTIC OPTIMIZATION OF A HYDROTHERMAL SYSTEM INCLUDING NETWORK CONSTRAINTS [J].
GORENSTIN, BG ;
CAMPODONICO, NM ;
COSTA, JP ;
PEREIRA, MVF .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (02) :791-797
[10]   Cut sharing for multistage stochastic linear programs with interstage dependency [J].
Infanger, G ;
Morton, DP .
MATHEMATICAL PROGRAMMING, 1996, 75 (02) :241-256