Scheduling Jobs on a Single Machine With Dirt Cleaning Consideration to Minimize Total Completion Time

被引:7
作者
Chen, Yarong [1 ]
Su, Ling-Huey [2 ]
Tsai, Ya-Chih [3 ]
Huang, Shenquan [1 ]
Chou, Fuh-Der [1 ]
机构
[1] Wenzhou Univ, Coll Mech & Elect Engn, Wenzhou 325035, Peoples R China
[2] Chung Yuan Christian Univ, Ind Engn Dept, Taoyuan 32023, Taiwan
[3] Vanung Univ, Dept Hotel Management, Taoyuan 32061, Taiwan
基金
中国国家自然科学基金;
关键词
Scheduling; total completion time; machine unavailability; mixed binary integer programming; heuristic algorithms; PERIODIC MAINTENANCE; DETERIORATING JOBS; ASSIGNMENT;
D O I
10.1109/ACCESS.2019.2898905
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper studies a single-machine scheduling problem observed in the wafer manufacturing process, where the machine must receive periodical maintenance so that the dirt generated in the process does not exceed the limit. The objective is to minimize the total completion times. A mixed binary integer programming model is formulated, and, due to its computational intractability for large problems, three effective heuristics are proposed based on our developed properties. The proposed heuristics are evaluated by comparison with exact solutions on small problems and with lower bounds on large problems. The experimental results show that the INDEX-LOE heuristic yields high-quality solutions in comparison with those obtained from the other two heuristics. Furthermore, the impacts of dirt accumulation and cleaning time are discussed in detail.
引用
收藏
页码:22290 / 22300
页数:11
相关论文
共 33 条
  • [21] Minimizing total absolute deviation of job completion times on a single machine with cleaning activities
    Su, Ling-Huey
    Wang, Hui-Mei
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 103 : 242 - 249
  • [22] Single-machine scheduling and common due date assignment with potential machine disruption
    Xiong, Xiaoyun
    Wang, Dujuan
    Cheng, T. C. Edwin
    Wu, Chin-Chia
    Yin, Yunqiang
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (03) : 1345 - 1360
  • [23] Single machine total completion time scheduling problem with workload-dependent maintenance duration
    Xu, Dehua
    Wan, Long
    Liu, Aihua
    Yang, Dar-Li
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 52 : 101 - 106
  • [24] Scheduling jobs under increasing linear machine maintenance time
    Xu, Dehua
    Yin, Yunqiang
    Li, Hongxing
    [J]. JOURNAL OF SCHEDULING, 2010, 13 (04) : 443 - 449
  • [25] Yang D.-L., 2002, Journal of the Chinese Institute of Industrial Engineers, V19, P63
  • [26] Minimizing total completion time on a single machine with a flexible maintenance activity
    Yang, Shan-lin
    Ma, Ying
    Xu, Dong-ling
    Yang, Jian-bo
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (04) : 755 - 770
  • [27] Parallel-machine scheduling of deteriorating jobs with potential machine disruptions
    Yin, Yunqiang
    Wang, Yan
    Cheng, T. C. E.
    Liu, Wenqi
    Li, Jinhai
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 69 : 17 - 28
  • [28] Approximation Schemes for Single-Machine Scheduling with a Fixed Maintenance Activity to Minimize the Total Amount of Late Work
    Yin, Yunqiang
    Xu, Jianyou
    Cheng, T. C. E. Edwin
    Wu, Chin-Chia
    Wang, Du-Juan
    [J]. NAVAL RESEARCH LOGISTICS, 2016, 63 (02) : 172 - 183
  • [29] Rescheduling on identical parallel machines with machine disruptions to minimize total completion time
    Yin, Yunqiang
    Cheng, T. C. E.
    Wang, Du-Juan
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 252 (03) : 737 - 749
  • [30] Due-date assignment and single-machine scheduling with generalised position-dependent deteriorating jobs and deteriorating multi-maintenance activities
    Yin, Yunqiang
    Wu, Wen-Hung
    Cheng, T. C. E.
    Wu, Chin-Chia
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2311 - 2326