共 50 条
Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects
被引:29
|作者:
Hasan, Shafiul
[1
]
Bouferguene, Ahmed
[2
]
Al-Hussein, Mohamed
[1
]
Gillis, Patrick
Telyas, Avi
[3
]
机构:
[1] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB T6G 2G7, Canada
[2] Univ Alberta, Edmonton, AB T6C 4G9, Canada
[3] Kullman Bldg Corp, Lebanon, NJ 08833 USA
关键词:
Tower cranes;
Crane selection;
Productivity;
CO2;
emissions;
Double-jib tower crane;
Carbon footprint;
CONSTRUCTION PRODUCTIVITY;
MOBILE CRANES;
SYSTEM;
OPTIMIZATION;
OPERATIONS;
SELECTION;
LOCATION;
D O I:
10.1016/j.autcon.2012.11.044
中图分类号:
TU [建筑科学];
学科分类号:
0813 ;
摘要:
Cranes maintain a central role in construction projects, and tower cranes are one of the major equipment used in the construction of high-rise buildings. As the scale of construction projects increases, selecting a proper crane becomes more important for the successful completion of projects, especially in regards to taller buildings. To provide lift engineers with a planning tool, this paper presents a crane selection methodology for high-rise building construction projects based on crane productivity performance, carbon footprint impact and simulation process. The crane productivity analysis considers a tower crane with two jibs that operates using propellers mounted at the end of each jib to improve the performance of crane operations. This paper presents a methodology to quantify and assess the environmental footprint (CO2 emissions) associated with the tower crane swing operation. A case study is presented to demonstrate the effectiveness of crane productivity and CO2 emission analysis for building construction projects. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:255 / 264
页数:10
相关论文