Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects

被引:29
|
作者
Hasan, Shafiul [1 ]
Bouferguene, Ahmed [2 ]
Al-Hussein, Mohamed [1 ]
Gillis, Patrick
Telyas, Avi [3 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB T6G 2G7, Canada
[2] Univ Alberta, Edmonton, AB T6C 4G9, Canada
[3] Kullman Bldg Corp, Lebanon, NJ 08833 USA
关键词
Tower cranes; Crane selection; Productivity; CO2; emissions; Double-jib tower crane; Carbon footprint; CONSTRUCTION PRODUCTIVITY; MOBILE CRANES; SYSTEM; OPTIMIZATION; OPERATIONS; SELECTION; LOCATION;
D O I
10.1016/j.autcon.2012.11.044
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Cranes maintain a central role in construction projects, and tower cranes are one of the major equipment used in the construction of high-rise buildings. As the scale of construction projects increases, selecting a proper crane becomes more important for the successful completion of projects, especially in regards to taller buildings. To provide lift engineers with a planning tool, this paper presents a crane selection methodology for high-rise building construction projects based on crane productivity performance, carbon footprint impact and simulation process. The crane productivity analysis considers a tower crane with two jibs that operates using propellers mounted at the end of each jib to improve the performance of crane operations. This paper presents a methodology to quantify and assess the environmental footprint (CO2 emissions) associated with the tower crane swing operation. A case study is presented to demonstrate the effectiveness of crane productivity and CO2 emission analysis for building construction projects. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:255 / 264
页数:10
相关论文
共 50 条
  • [1] Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    AUTOMATION IN CONSTRUCTION, 2021, 127
  • [2] Cost and CO2 Emission Optimization of Steel Reinforced Concrete Columns in High-Rise Buildings
    Park, Hyo Seon
    Kwon, Bongkeun
    Shin, Yunah
    Kim, Yousok
    Hong, Taehoon
    Choi, Se Woon
    ENERGIES, 2013, 6 (11): : 5609 - 5624
  • [3] Automatic tower crane layout planning system for high-rise building construction using generative adversarial network
    Li, Rongyan
    Chi, Hung-Lin
    Peng, Zhenyu
    Li, Xiao
    Chan, Albert P. C.
    ADVANCED ENGINEERING INFORMATICS, 2023, 58
  • [4] Optimal Location for Tower Crane and Dynamic Trailer Parking in High-Rise Modular Building Construction Project
    Malaikrisanachalee, Suphawut
    Wongwai, Narongrit
    Butsan, Nujet
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2024, 9 (05) : 965 - 987
  • [5] Green hydrogen coupling with CO2 utilization of coal-to-methanol for high methanol productivity and low CO2 emission
    Wang Dongliang
    Meng Wenliang
    Zhou Huairong
    Li Guixian
    Yang Yong
    Li Hongwei
    ENERGY, 2021, 231
  • [6] Location Optimization of Tower Cranes on High-Rise Modular Housing Projects
    Zhou, Cong
    Dai, Fu
    Xiao, Zerui
    Liu, Wei
    BUILDINGS, 2023, 13 (01)
  • [7] Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programming
    Huang, C.
    Wong, C. K.
    Tam, C. M.
    AUTOMATION IN CONSTRUCTION, 2011, 20 (05) : 571 - 580
  • [8] Virtual reality supported interactive tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    AUTOMATION IN CONSTRUCTION, 2021, 130
  • [9] Tower Crane Location Optimization for Heavy Unit Lifting in High-Rise Modular Construction
    Hyun, Hosang
    Park, Moonseo
    Lee, Dowan
    Lee, Jeonghoon
    BUILDINGS, 2021, 11 (03)
  • [10] Critical considerations on tower crane layout planning for high-rise modular integrated construction
    Zhang, Zhiqian
    Pan, Wei
    Pan, Mi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (07) : 2615 - 2634