Modeling of Helper Robots in Manufacturing Systems Using Petri Nets

被引:0
作者
Khanmohammadi, S. [1 ]
Ghadiri, H. [2 ]
Jahedmotlagh, M. R. [3 ]
机构
[1] Univ Tabriz, Fac Elect & Comp Engn, Tabriz, Iran
[2] Univ Tabriz, Dept Elect & Comp Engn, Tabriz, Iran
[3] Iran Univ Sci & Technol, Fac Comp Engn, Tabriz, Iran
来源
2008 IEEE INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORKS, VOLS 1-8 | 2008年
关键词
D O I
10.1109/IJCNN.2008.4634025
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In this paper the Timed Petri Net (TPN) is used for modeling the operations of co-operative robots in Flexible Manufacturing Systems (FMS). The effect of fault parameters and the number of co-operative robots -we call them the helpers- in the performance of the system is investigated. These special purpose robots are used to decrease the operation times, as well as to increase the total performance of the system. These robots perform the preliminary tasks on the waiting jobs (parts) in the wait lines or input buffers of machines. Also some Automatic Guided Vehicles (AGVs) are used as material handlers between machines while performing some simple preliminary tasks during the material handling. Some sub-TPNs are used for modeling of FMS and helper robots, as special purpose robots. Simulation results show that by using the helpers, there will be a decrease of 23.7 percent in mean operation time of system, and a decrease of 25.4 percent in the mean waiting time of jobs at input buffers.
引用
收藏
页码:1692 / +
页数:2
相关论文
共 15 条
  • [1] Anh T L, 2006, EUR J OPER RES, P1
  • [2] CHAN FTS, 2004, ANAL DYNAMIC CONTROL, P423
  • [3] Scheduling and routing of automated guided vehicles:: A hybrid approach
    Correa, Ayoub Insa
    Langevin, Andre
    Rousseau, Louis-Martin
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (06) : 1688 - 1707
  • [4] GANESHARAJAHA T, 1998, ANN OPER RES, P109
  • [5] GERTOSIO C, 2000, INT J PROD ECON, P285
  • [6] Fuzzy speed and steering control of an AGV
    Kodagoda, KRS
    Wijesoma, WS
    Teoh, EK
    [J]. IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2002, 10 (01) : 112 - 120
  • [7] LEE JK, 2006, SCHEDULING ANAL FMS, P432
  • [8] MELLADO EL, 2002, ANAL DISCRETE EVENT, P53
  • [9] REZAIEN K, 2007, APPL MATH COMPUT, P729
  • [10] Integrated manufacturing planning for an AGV-based FMS
    Seo, Y
    Egbelu, PJ
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 60-1 : 473 - 478