Simulation optimization based ant colony algorithm for the uncertain quay crane scheduling problem

被引:26
作者
Rouky, Naoufal [1 ]
Abourraja, Mohamed Nezar [1 ]
Boukachour, Jaouad [1 ]
Boudebous, Dalila [1 ]
El Hilali Alaoui, Ahmed [2 ]
El Khoukhi, Fatima [3 ]
机构
[1] Normandie Univ, UNIHAVRE, F-76600 Le Havre, France
[2] Sidi Mohamed Ben Abdallah Univ, Fac Sci & Technol, Fes 2202, Morocco
[3] Moulay Ismail Univ, Fac Arts & Humanities, BP 11202, Meknes, Morocco
关键词
Container terminal; Simulation Optimization; Quay crane; Uncertainty; GENETIC ALGORITHM; BRANCH;
D O I
10.5267/j.ijiec.2018.2.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This work is devoted to the study of the Uncertain Quay Crane Scheduling Problem (QCSP), where the loading /unloading times of containers and travel time of quay cranes are considered uncertain. The problem is solved with a Simulation Optimization approach which takes advantage of the great possibilities offered by the simulation to model the real details of the problem and the capacity of the optimization to find solutions with good quality. An Ant Colony Optimization (ACO) meta-heuristic hybridized with a Variable Neighborhood Descent (VND) local search is proposed to determine the assignments of tasks to quay cranes and the sequences of executions of tasks on each crane. Simulation is used inside the optimization algorithm to generate scenarios in agreement with the probabilities of the distributions of the uncertain parameters, thus, we carry out stochastic evaluations of the solutions found by each ant. The proposed optimization algorithm is tested first for the deterministic case on several well-known benchmark instances. Then, in the stochastic case, since no other work studied exactly the same problem with the same assumptions, the Simulation Optimization approach is compared with the deterministic version. The experimental results show that the optimization algorithm is competitive as compared to the existing methods and that the solutions found by the Simulation Optimization approach are more robust than those found by the optimization algorithm. (C) 2019 by the authors; licensee Growing Science, Canada
引用
收藏
页码:111 / 132
页数:22
相关论文
共 55 条
[1]   A Multi-Agent Based Simulation Model for Rail-Rail Transshipment: An Engineering Approach for Gantry Crane Scheduling [J].
Abourraja, Mohamed Nezar ;
Oudani, Mustapha ;
Samiri, Mohamed Yassine ;
Boudebous, Dalila ;
El Fazziki, Abdelaziz ;
Najib, Mehdi ;
Bouain, Abdelhadi ;
Rouky, Naoufal .
IEEE ACCESS, 2017, 5 :13142-13156
[2]   A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty [J].
Al-Dhaheri, Noura ;
Jebali, Aida ;
Diabat, Ali .
SIMULATION MODELLING PRACTICE AND THEORY, 2016, 66 :122-138
[3]  
[Anonymous], 2016, REV MAR TRANSP
[4]  
[Anonymous], 2014, Review of Maritime Transport
[5]   A memetic algorithm to solve the dynamic multiple runway aircraft landing problem [J].
Bencheikh, Ghizlane ;
Boukachour, Jaouad ;
Alaoui, Ahmed El Hilali .
JOURNAL OF KING SAUD UNIVERSITY-COMPUTER AND INFORMATION SCIENCES, 2016, 28 (01) :98-109
[6]  
Benghalia A., 2016, LOGISTIQUE MANAGEMEN, V24, P57
[7]   SIMULATION OPTIMIZATION: APPLICATIONS IN RISK MANAGEMENT [J].
Better, Marco ;
Glover, Fred ;
Kochenberger, Gary ;
Wang, Haibo .
INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY & DECISION MAKING, 2008, 7 (04) :571-587
[8]   A follow-up survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 244 (03) :675-689
[9]   A survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) :615-627
[10]   A fast heuristic for quay crane scheduling with interference constraints [J].
Bierwirth, Christian ;
Meisel, Frank .
JOURNAL OF SCHEDULING, 2009, 12 (04) :345-360