Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance

被引:38
|
作者
Gouiaa-Mtibaa, A. [1 ]
Dellagi, S. [1 ]
Achour, Z. [1 ]
Erray, W. [2 ]
机构
[1] Lorraine Univ, LGIPM, Metz, France
[2] Credit Agr SA, Paris, Ile De France, France
关键词
Maintenance strategies; Imperfect preventive maintenance; Reworking; Quality; Degradation; ECONOMIC PRODUCTION QUANTITY; STAGE PRODUCTION SYSTEM; LEASED EQUIPMENT; MODEL; REPAIR; STRATEGY; SIZE;
D O I
10.1016/j.ress.2017.12.020
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a manufacturing system subject to an increasing random failure rate and producing conforming and non-conforming items. Two types of non-defective products are considered: high quality items noted first-rate products and substandard quality items noted second-rate products. Rework activities are proposed for second-rate and non-conforming products in order to improve their quality conditions and sell them at the best price, In order to slow down the degradation process of the manufacturing system and reduce its impact on the quality of output products, a new improved imperfect preventive maintenance (PM) policy with minimal repair at failures is established. It consists in performing a given number of imperfect PM actions before undertaking a perfect one. This study consists in developing an analytical model to determine simultaneously the optimal values of two decision variables: the number of produced batches before performing the imperfect PM, and the number of imperfect PM actions to undertake before applying a perfect one by maximizing the total expected profit taking into account the selling price and production, maintenance and reworking costs. Numerical examples and a sensitivity study are presented to illustrate the use of the proposed model and the obtained results. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1 / 11
页数:11
相关论文
共 50 条
  • [21] Selective Preventive Maintenance Scheduling Under Imperfect Repair
    Pandey, Mayank
    Zuo, Ming J.
    59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2013,
  • [22] Integrated model of quality inspection, preventive maintenance and buffer stock in an imperfect production system
    Lopes, Rodrigo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 126 : 650 - 656
  • [23] IMPERFECT PREVENTIVE-MAINTENANCE
    NAKAGAWA, T
    IEEE TRANSACTIONS ON RELIABILITY, 1979, 28 (05) : 402 - 402
  • [24] INTEGRATED PRODUCTION MAINTENANCE MODEL UNDER IMPERFECT AGE-BASED MAINTENANCE POLICY AND NON-NEGLIGIBLE MAINTENANCE TIMES
    El-Ferik, Sami
    Ben-Daya, Mohammed
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2010, 27 (04) : 539 - 558
  • [25] Optimal hybrid imperfect preventive maintenance policy for leased equipment
    Ben Mabrouk, A.
    Chelbi, A.
    Radhoui, M.
    IFAC PAPERSONLINE, 2017, 50 (01): : 13698 - 13703
  • [26] A modified imperfect preventive maintenance policy considering failure replacement
    Chen, Mingchih
    Wang, Min
    Horng, Horng-Chyi
    JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2010, 27 (01) : 37 - 43
  • [27] Maintenance modelling using generalized renewal process for sequential imperfect corrective and preventive maintenance
    Tanwar, Monika
    Bolia, Nomesh
    International Journal of Performability Engineering, 2015, 11 (05) : 427 - 442
  • [28] Modelling and Analysis of Maintenance Contract with Imperfect Preventive Maintenance
    Husniah, H.
    Cakravastia, A.
    Iskandar, B. P.
    Pasaribu, U. S.
    2015 INTERNATIONAL CONFERENCE ON TECHNOLOGY, INFORMATICS, MANAGEMENT, ENGINEERING & ENVIRONMENT (TIME-E), 2015, : 25 - 30
  • [29] Integrated production and quality model under various preventive maintenance policies
    Ben-Daya, M
    Makhdoum, M
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (08) : 840 - 853
  • [30] AN OPTIMAL BLOCK PREVENTIVE MAINTENANCE POLICY FOR A MULTI-UNIT SYSTEM CONSIDERING IMPERFECT MAINTENANCE
    Park, J. H.
    Lee, S. C.
    Hong, J. W.
    Lie, C. H.
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2009, 26 (06) : 831 - 847