A new approach in pinch technology considering piping costs in total cost targeting for heat exchanger network

被引:31
作者
Akbarnia, M. [1 ]
Amidpour, Majid [1 ]
Shadaram, A. [1 ]
机构
[1] KN Toosi Univ Technol, Fac Mech Engn, Dept Energy Syst Engn, 15 Pardis St Mollahsadra Ave, Tehran, Iran
关键词
Heat exchanger network; Pinch technology; Energy saving; Process integration; Piping cost;
D O I
10.1016/j.cherd.2008.09.001
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
The current targeting method for a heat exchanger network identifies an optimum point from material and energy balance prior to design. This optimum point is obtained by tradeoff between energy costs and heat exchangers capital cost. The current method does not consider piping costs associated to heat exchangers. In the targeting method as energy increases, heat exchanger area decreases, but piping size increases as the mass flow rate of utility streams increases. It means by increasing energy costs, heat exchanger cost decreases, however piping costs will increase. So piping costs can affect the total capital cost (heat exchanger costs plus piping costs). As a result considering piping costs in the targeting method may change the global optimality. it is obvious that without the correct initialization of design, the global optimum cost for heat exchanger network cannot be achieved. This paper presents a correlation for estimating piping costs for each stream as their piping size, material of construction and pressure rating. it also develops a method which the allows consideration of piping costs in the current targeting method. (C) 2008 The Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:357 / 365
页数:9
相关论文
共 4 条
  • [1] Bausbacher E.F., 1993, Process Plant Layout and Piping Design, by
  • [2] Peters M. S., 2003, PLANT DESIGN EC CHEM, V4
  • [3] POLLEY GT, 1990, PRESSURE DROP CONSID
  • [4] Smith R, 2005, CHEM PROCESS DESIGN