A Novel Safety Risk Assessment Based on Fuzzy Set Theory and Decision Methods in High-Rise Buildings

被引:16
作者
Ansari, Ramin [1 ]
Dehghani, Parisa [1 ]
Mahdikhani, Mahdi [1 ]
Jeong, Jaewook [2 ]
机构
[1] Imam Khomeini Int Univ, Dept Civil Engn, Qazvin 3414896818, Iran
[2] Seoul Natl Univ Sci & Technol, Dept Safety Engn, 232 Gongneung Ro, Seoul 01811, South Korea
关键词
high-rise building; safety risk; multicriteria decision making; best-worst; fuzzy VIKOR; CONSTRUCTION PROJECTS; HIERARCHY PROCESS; MAKING METHOD; AHP; VIKOR; IDENTIFICATION; SELECTION; DEMATEL; MODEL;
D O I
10.3390/buildings12122126
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The high-rise construction industry has particular features, such as prolonged construction periods and constant change in the workplace. These features may have turned it into the most dangerous industry, given its significant mortality rate. This research aims to identify effective criteria for high-rise buildings' safety issues and rank the most critical risks to level up the safety of these projects. This research is divided into two phases: In Phase I, the effective criteria in the literature on the occurrence of accidents are divided into three main classes, and their weights are determined using the best-worst method. In Phase II, the existing risks are ranked using the fuzzy Vlse Kriterijumska Optimizacija Kompromisno Resenje (FUZZY VIKOR) method. The results indicate that safety training and monitoring, which account for approximately 35% of the total weight, are the most influential criteria for risk occurrence. The risk of falling from heights has been ranked first as the most critical safety risk according to the eight criteria, including safety training and monitoring. The total weight of criteria in which falling from height attains the first rank equals 0.688. Damages caused by working with manual tools and equipment have the highest priority in four criteria, and the total weight of 0.1591 attains the second rank. The results of this research comply with the current situation of the construction industry and pave the way for future research on high-rise construction projects.
引用
收藏
页数:31
相关论文
共 57 条
[51]   Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies [J].
Taylan, Osman ;
Bafail, Abdallah O. ;
Abdulaal, Reda M. S. ;
Kabli, Mohammed R. .
APPLIED SOFT COMPUTING, 2014, 17 :105-116
[52]   Exploring Empirical Rules for Construction Accident Prevention Based on Unsafe Behaviors [J].
Wang, Han-Hsiang ;
Chen, Jieh-Haur ;
Arifai, Achmad Muhyidin ;
Gheisari, Masoud .
SUSTAINABILITY, 2022, 14 (07)
[53]   Critical factors for the use or non-use of personal protective equipment amongst construction workers [J].
Wong, Tom Ka Man ;
Man, Siu Shing ;
Chan, Alan Hoi Shou .
SAFETY SCIENCE, 2020, 126
[54]   A group decision making framework based on fuzzy VIKOR approach for machine tool selection with linguistic information [J].
Wu, Zhibin ;
Ahmad, Jamil ;
Xu, Jiuping .
APPLIED SOFT COMPUTING, 2016, 42 :314-324
[55]   Applying a new systematic fuzzy FMEA technique for risk management in light steel frame systems [J].
Yeganeh, Ali ;
Heravi, Moein Younesi ;
Razavian, Seyed Behnam ;
Behzadian, Kourosh ;
Shariatmadar, Hashem .
JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2022, 21 (06) :2481-2502
[56]   A Risk Analysis and Ranking Application for Lifting Vehicles Used in Construction Sites with Integrated AHP and Fine-Kinney Approach [J].
Yilmaz, Fatih ;
Ozcan, Mehmet Selim .
ADVANCES IN SCIENCE AND TECHNOLOGY-RESEARCH JOURNAL, 2019, 13 (03) :152-161
[57]  
Zaini A., 2022, MALAYS CONSTR RES, V32, P59