Uncertainty management in time estimation of construction projects: A systematic literature review and new model development

被引:7
作者
Naderpour, A. [1 ]
Sardroud, J. Majrouhi [1 ]
Mofid, M. [2 ]
Xenidis, Y. [3 ]
Rostam, T. Pour [1 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Cent Tehran Branch, Tehran, Iran
[2] Sherif Univ Technol, Dept Civil Engn, Tehran, Iran
[3] Aristotle Univ Thessaloniki, Dept Civil Engn, Thessaloniki, Greece
关键词
Time estimation; Uncertainty; Fuzzy logic; Risk management; Construction projects; COST TRADE-OFF; GENETIC ALGORITHM APPROACH; FUZZY-SET APPROACH; FLEXIBLE CONSTRAINTS; ROBUST OPTIMIZATION; ACTIVITY DURATIONS; COMPLEX PROJECTS; PROCESSING TIMES; RISK-MANAGEMENT; SCHEDULE RISK;
D O I
10.24200/sci.2017.4605
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Nowadays, the very low reliability of project planning in certainty-based approaches has led to the use of more intelligent methods for uncertainty management in construction projects. This systematic study aims to survey the methods which have been used to manage the uncertainties in time estimation of construction projects. A series of steps were undertaken during the review. The study was started with determining the purpose, selecting appropriate keywords, and reducing the selected papers using some criteria. A deeper analysis was carried out on the final paper that met the criteria for this review. The study was limited solely to papers referred to in six top online databases. It aimed to review how the papers had been distributed by a period of publishing, country, and the domains that the methods had been applied for. The result confirmed that uncertainties which affected any project were controlled by Risk Management and Fuzzy Logic based on probability and possibility theories. Finally, a hybrid method for uncertainty management in project scheduling was proposed. The result of the implementation of this method in the construction project of Iranian Gas Company showed that the proposed method increased the accuracy of time estimation by about 8 to 24 percent. (C) 2019 Sharif University of Technology. All rights reserved.
引用
收藏
页码:752 / 778
页数:27
相关论文
共 216 条
[1]  
Abdeddaïm Y, 2003, LECT NOTES COMPUT SC, V2619, P240
[2]   Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects' Portfolio [J].
Abido, M. A. ;
Elazouni, Ashraf M. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (01) :85-97
[3]   A new approach for project control under uncertainty. Going back to the basics [J].
Acebes, Fernando ;
Pajares, Javier ;
Manuel Galan, Jose ;
Lopez-Paredes, Adolfo .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (03) :423-434
[4]   Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost [J].
Afshar, Abbas ;
Fathi, Habib .
ENGINEERING OPTIMIZATION, 2009, 41 (11) :1063-1080
[5]   SIMULATION-MODEL TO FORECAST PROJECT COMPLETION-TIME [J].
AHUJA, HN ;
NANDAKUMAR, V .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (04) :325-342
[6]   A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty [J].
Al-Dhaheri, Noura ;
Jebali, Aida ;
Diabat, Ali .
SIMULATION MODELLING PRACTICE AND THEORY, 2016, 66 :122-138
[7]   New Approach to Model Material-Related Problems Contributing to Project Delays Using Rotational Fuzzy Set [J].
Al-Humaidi, H. M. ;
Tan, F. Hadipriono .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2012, 26 (03) :279-286
[8]   Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects [J].
AlNasseri, Hammad ;
Aulin, Radhlinah .
ENGINEERING MANAGEMENT JOURNAL, 2015, 27 (02) :58-72
[9]   Dynamic planning of construction activities using hybrid simulation [J].
Alzraiee, Hani ;
Zayed, Tarek ;
Moselhi, Osama .
AUTOMATION IN CONSTRUCTION, 2015, 49 :176-192
[10]  
Amanatyazdi L., 2013, J ENV STUDIES, V39, P61