Assessment and mitigation of coal bump risk during extraction of an island longwall panel

被引:96
作者
Jiang, Yaodong [1 ]
Wang, Hongwei [1 ]
Xue, Sheng [2 ]
Zhao, Yixin [1 ]
Zhu, Jie [1 ]
Pang, Xufeng [1 ]
机构
[1] China Univ Min & Technol, Sch Mech Architecture & Civil Engn, Beijing 100083, Peoples R China
[2] CSIRO Earth Sci & Resource Engn, Kenmore, Qld 4069, Australia
基金
中国国家自然科学基金;
关键词
Island longwall panel; Coal bump; Bump-prone zones; Stress relief; Boreholes; ELECTROMAGNETIC-RADIATION; PILLAR DESIGN; STRESS; STABILITY; STRENGTH;
D O I
10.1016/j.coal.2012.02.003
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This study presents an integrated approach for field tests and numerical investigations to assess the risk of coal bumps. This approach produces a stress-relief technology using boreholes to mitigate risk during the extraction of an island longwall panel. The field tests were conducted in an island longwall panel in the Tangshan coal mine in the city of Tangshan, China. In these tests, roadway roof displacement and electromagnetic radiation (EMR) of roadways in the panel were investigated to determine the zones of intensive roof deformation. A numerical model FLAC(3D) (Fast Lagrangian Analysis of Continua in 3 Dimensions) was established to understand the results of the field tests and to map the zones in the panel with a high risk for coal bumps. The results of the field tests and the numerical modeling show that the roof deformation starts to occur at more than 30 m ahead of the longwall face and the deformation starts to accelerate after a distance of 10 m in front of the longwall face. Large and rapid roof deformation is considered to be an important precursor of coal bump occurrence during the extraction of an island longwall panel. Based on these results, a stress-relief technology using boreholes was investigated through numerical methods. The modeled results suggest that the abutment stress could be released by drilling boreholes in the zones prone to coal bumps. The effectiveness of the stress release increased with the borehole length and decreased with the borehole spacing. Crown Copyright (C) 2012 Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:20 / 33
页数:14
相关论文
共 38 条
[1]  
[Anonymous], 2006, FLAC3D FAST LAGR AN
[2]  
Bieniawski Z.T., 1994, P 13 C GROUND CONTR, P81
[4]   Three-dimensional analysis of coal barrier pillars in tailgate area adjacent to the fully mechanized top caving mining face [J].
Cheng, Y. M. ;
Wang, J. A. ;
Xie, G. X. ;
Wei, W. B. .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2010, 47 (08) :1372-1383
[5]  
[窦林名 Dou Linming], 2003, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V22, P1866
[6]  
FAMA MED, 1995, INT J ROCK MECH MIN, V32, P215
[7]   Electromagnetic radiation induced by mining rock failure [J].
Frid, V ;
Vozoff, K .
INTERNATIONAL JOURNAL OF COAL GEOLOGY, 2005, 64 (1-2) :57-65
[8]  
Galvin J. M., 1999, 37 US ROCK MECH S VA, P63
[9]  
Galvin J.M., 2006, P 41 US S ROCK MECH, P1129
[10]  
HE Y, 2003, J ROCK SOIL MECH S, V24, P593