Solution algorithms for dynamic lot-sizing in remanufacturing systems

被引:17
作者
Ahn, Hyung-Dae [1 ]
Lee, Dong-Ho [1 ]
Kim, Hwa-Joong [2 ]
机构
[1] Hanyang Univ, Dept Ind Engn, Seoul 133791, South Korea
[2] Inha Univ, Grad Sch Logist, Inchon 402751, South Korea
关键词
remanufacturing; dynamic lot-sizing; dynamic programming; heuristics; PRODUCT RECOVERY; PLANNING-MODEL; CAPACITY;
D O I
10.1080/00207543.2010.535038
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the problem of determining the lot sizes that satisfy the demands of remanufactured products over a given planning horizon with discrete time periods. Remanufacturing, in which used or end-of-life products are restored to like-new condition, typically consists of disassembly, reprocessing and reassembly processes, and hence the lot sizes are determined for each of the three processes. The objective is to minimise the sum of setup and inventory holding costs occurring at the three processes. To represent the problem mathematically, we suggest a mixed integer programming model by combining the existing ones for disassembly and assembly systems. After proving that the problem is NP-hard, we suggest two dynamic programming based heuristics, called the aggregation and the decomposition type heuristics in this paper. Computational experiments were done on various test instances, and the results show that the two heuristics give near-optimal solutions in a short amount of computation time. Also, the performances of the heuristics are compared according to different values of problem parameters.
引用
收藏
页码:6729 / 6748
页数:20
相关论文
共 30 条
  • [11] A branch and bound algorithm for disassembly scheduling with assembly product structure
    Kim, H-J
    Lee, D-H
    Xirouchakis, P.
    Kwon, O. K.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (03) : 419 - 430
  • [12] Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
    Kim, HJ
    Lee, DH
    Xirouchakis, P
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (01) : 195 - 212
  • [13] Disassembly scheduling with multiple product types
    Kim, HJ
    Lee, DH
    Xirouchakis, P
    Züst, R
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2003, 52 (01): : 403 - 406
  • [14] Capacitated disassembly scheduling with random demand
    Kim, Hwa-Joong
    Xirouchakis, Paul
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (23) : 7177 - 7194
  • [15] KIM HWAJOONG, 2008, [Journal of the Korean Institute of Industrial Engineers, 대한산업공학회지], V34, P414
  • [16] Disassembly scheduling with capacity constraints: minimizing the number of products disassembled
    Kim, Jun-Gyu
    Jeon, Hyong-Bae
    Kim, Hwa-Joong
    Lee, Dong-Ho
    Xirouchakis, Paul
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2006, 220 (09) : 1473 - 1481
  • [17] Supply planning model for remanufacturing system in reverse logistics environment
    Kim, Kibum
    Song, Iksoo
    Kim, Juyong
    Jeong, Bongju
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 51 (02) : 279 - 287
  • [18] Optimal policy and holding cost stability regions in a periodic review inventory system with manufacturing and remanufacturing options
    Konstantaras, I.
    Papachristos, S.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 178 (02) : 433 - 448
  • [19] Disassembly scheduling: integer programming models
    Lee, DH
    Kim, HJ
    Choi, G
    Xirouchakis, P
    [J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2004, 218 (10) : 1357 - 1372
  • [20] Disassembly scheduling with capacity constraints
    Lee, DH
    Xirouchakis, P
    Zust, R
    [J]. CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2002, 51 (01) : 387 - 390