Part orientation in stereolithography

被引:85
作者
Pham, DT [1 ]
Dimov, SS [1 ]
Gault, RS [1 ]
机构
[1] Univ Wales, Sch Engn, Div Syst Engn, Cardiff CF2 3TE, S Glam, Wales
关键词
rapid prototyping; stereolithography;
D O I
10.1007/s001700050118
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Rapid prototyping (RP) machines reduce the lead time and cost of new products by automating the prototype manufacturing phase of the product development process. However, it is necessary for operators to orientate the prototype correctly in the RP machine to obtain the best trade-off between time, cost, and accuracy. The purpose of this work is to produce a decision-support tool to help RP users in this task. The tool is aimed at stereolithography which is the most widely adopted RP technology. The tool is a feature-based system produced using an object-orientated programming language and a solid modelling CAD environment. Cost, time, problematic features, optimally orientated features, overhanging area, and support volume are considered when recommending a build direction to the user. Three sample parts were used to illustrate the performance of the system. The system yielded the best surface finish and correctly highlighted several problem features.
引用
收藏
页码:674 / 682
页数:9
相关论文
共 11 条
  • [1] Predicting total build-time and the resultant cure depth of the 3D stereolithography process
    Chen, Calvin C.
    Sullivan, Paul A.
    [J]. RAPID PROTOTYPING JOURNAL, 1996, 2 (04) : 27 - 40
  • [2] CHENG ADY, 1995, GRAVITATION COSMOLOG, V1, P12
  • [3] FRANK D, 1994, 5 INT C RAP PROT DAY, P191
  • [4] Jacobs P. F., 1992, 1 EUR C RAP PROT NOT, P1
  • [5] Determining fabrication orientations for rapid prototyping with stereolithography apparatus
    Lan, PT
    Chou, SY
    Chen, LL
    Gemmill, D
    [J]. COMPUTER-AIDED DESIGN, 1997, 29 (01) : 53 - 62
  • [6] CONCURRENT INTELLIGENT RAPID PROTOTYPING ENVIRONMENT
    MASOOD, SH
    LIM, BS
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 1995, 6 (05) : 291 - 310
  • [7] OSORIO A, 1996, RAP PROD DEV C STUTT
  • [8] PHAM DT, 1997, PROT TECHN INT 97 UK, P15
  • [9] SWAELENS B, 1994, 6 INT C RAP PROT DAY, P115
  • [10] TATA K, 1995, PROCEDURE ESTIMATE B