Field Monitoring and Numerical Simulation Study on Mechanical Characteristics of Extra-long Highway Tunnel

被引:0
作者
Li, Xun [1 ]
He, Chuan [1 ]
Xu, Guowen [1 ]
机构
[1] SW Jiaotong Univ, Sch Civil Engn, Chengdu 610031, Sichuan, Peoples R China
来源
PROGRESS IN CIVIL ENGINEERING, PTS 1-4 | 2012年 / 170-173卷
关键词
Extra-long Tunnel; Monitoring and Measurement Scheme; Numerical Simulation; Mechanical Characteristics;
D O I
10.4028/www.scientific.net/AMM.170-173.1450
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Taking Motianling tunnel in Chongqing as an engineering background, the monitoring and measurement scheme is proposed for the extra-long tunnel under complex condition, and the field data and the numerical simulation results is analyzed. The results indicates that, the selected cross-section reflect overall state of the Motianling tunnel, and the structure safety monitoring during operation is considered; by tunnel internal and external observation, it is found that the tunnel face in F22 fault zone may not stay stability, because the monitoring information receive feedback timely, and the supporting measures is proper, the surrounding rock stay stability when excavating; for the typical section, the surrounding rock contact pressure is greater than interlayer pressure, primary lining sustains most of the load,and the secondary lining plays an assistant role as safety reservation; the maximum of anchor axial force and surrounding rock pressure occur at tunnel crown. By monitoring and numerical simulation, the dynamic excavation and design is realized, the Motianling tunnel is achieved safely and successfully at last.
引用
收藏
页码:1450 / 1454
页数:5
相关论文
共 5 条
[1]  
Bhalla S, 2005, TUNNELING UNDERGROUN, V20, P478
[2]  
Iwasaki A, 2005, SMART MATER STRUCT, V14, P54
[3]  
[来弘鹏 LAI Hong-peng], 2009, [岩土工程学报, Chinese Journal of Geotechnical Engineering], V31, P390
[4]  
[徐建国 XU Jianguo], 2008, [中国公路学报, China Journal of Highway and Transport], V21, P81
[5]  
Zhang CP, 2009, ROCK SOIL MECH, V30, P1861