A NOVEL DESIGN OF MOBILE OFFSHORE DRILLING UNIT FOR ARCTIC CONDITIONS

被引:0
作者
Bereznitski, Alexei [1 ]
机构
[1] Huisman Equipment BV, Sect Naval Architecture, Schiedam, Netherlands
来源
OMAE2011: PROCEEDINGS OF THE ASME 30TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, VOL 1: OFFSHORE TECHNOLOGY: POLAR AND ARCTIC SCIENCES AND TECHNOLOGY | 2011年
关键词
D O I
暂无
中图分类号
P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Exploration of Arctic offshore for oil and gas sets extremely high requirements for Mobile Offshore Drilling Units (MODU). Arctic offshore is one of the harshest environments on the planet. Low temperatures, high winds and ice infested waters represent great challenge. Drilling units, which are optimized for severe ice loads, are vulnerable to waves when water clears from the ice. MODU's specifically designed for open water and extreme waves have poor ice resistant performance. A Novel Design of column stabilized Mobile Offshore Drilling Unit named JBF Arctic is presented in the paper. The major feature of the unit is the combination of exceptional seakeeping characteristics and excellent ice resistance. This is achieved by utilization of a dual draft concept. In open water the unit has a draft which is typical for column stabilized units. In ice the unit is submerged to a deeper draft where a cone shaped heavily reinforced upper structure receives the ice loads. This paper deals with results of extensive research including seakeeping calculations, model testing in a seakeeping tank, studies on ice loads, model testing in an ice tank, and analysis of the mooring system.
引用
收藏
页码:865 / 871
页数:7
相关论文
共 50 条
[41]   EXPERIMENTAL AND OPTIMIZATION DESIGN OF OFFSHORE DRILLING SEAL [J].
Zhang, Yi ;
Zhang, Xiaodong ;
Chang, Xueping ;
Wu, Qian .
POLISH MARITIME RESEARCH, 2017, 24 :72-78
[42]   A NEW MONOHULL FORM DEVELOPMENT AS APPLIED TO AN OFFSHORE DRILLING UNIT [J].
MICHAEL, FY ;
WALLER, DB .
MARINE TECHNOLOGY AND SNAME NEWS, 1986, 23 (01) :55-73
[43]   ARCTIC OFFSHORE PIPELINE DESIGN AND INSTALLATION CHALLENGES [J].
Paulin, Mike ;
DeGeer, Duane ;
Cocker, Joseph ;
Flynn, Mark .
33RD INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2014, VOL 6A: PIPELINE AND RISER TECHNOLOGY, 2014,
[44]   OFFSHORE DRILLING INCREASES, ATTRITION, CUT MOBILE RIG SURPLUS [J].
MOORE, WD .
OIL & GAS JOURNAL, 1984, 82 (19) :103-105
[45]   PROBABILISTIC RED LIMIT STUDY FOR MOBILE OFFSHORE DRILLING UNITS [J].
Gjerde, Tony ;
Chen, Haibo .
33RD INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, 2014, VOL 4B, 2014,
[46]   Mobile offshore drilling rig newbuild and replacement cost functions [J].
Mark J Kaiser ;
Brian Snyder .
Maritime Economics & Logistics, 2010, 12 :392-429
[47]   Mobile offshore drilling rig newbuild and replacement cost functions [J].
Kaiser, Mark J. ;
Snyder, Brian .
MARITIME ECONOMICS & LOGISTICS, 2010, 12 (04) :392-429
[48]   OPTIMAL PRELIMINARY SELECTION OF MOBILE OFFSHORE DRILLING UNITS. [J].
ZUMWALT, CRANE E. .
1982, V 19 (N 4) :341-349
[49]   Safety of dynamic positioning operations on mobile offshore drilling units [J].
Chen, Haibo ;
Moan, Torgeir ;
Verhoevenc, Harry .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2008, 93 (07) :1072-1090
[50]   Application of the Purdue Enterprise Reference Architecture (PERA) Model for the Cyber Secure ICS Architecture of the Offshore Mobile Drilling Unit [J].
Ilja, David .
IPSI BGD TRANSACTIONS ON INTERNET RESEARCH, 2025, 21 (01) :107-118