AUTOMATIC PRECEDENCE CONSTRAINT GENERATION FOR ASSEMBLY SEQUENCE PLANNING USING A THREE-DIMENSIONAL SOLID MODEL

被引:1
作者
Alfadhlani [1 ]
Samadhi, T. M. A. Ari [2 ]
Ma'ruf, Anas [2 ]
Toha, Isa Setiasyah [2 ]
机构
[1] Andalas Univ, Ind Engn Dept, Padang 25163, Indonesia
[2] Bandung Inst Technol, Ind Engn Dept, Jl Ganesha 10, Bandung 40132, Indonesia
关键词
Assembly sequence; CAD; Collision detection; Precedence constraint;
D O I
10.14716/ijtech.v10i2.3064
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The assembly sequence planning of a product can be generated through three phases: first, generating precedence constraints; second, searching for assembly sequence alternatives; and third, selecting the best assembly sequence. Assembly sequence generation needs precedence constraints in order to find a feasible assembly. A collision between two components can cause the blocking of one by the other after assembly. This research proposes an automated method for generating precedence constraints. The method employs certain information: the collision-free assembly path; the number of connections between components; and component volume. This information is extracted from the CAD (Computer Aided Design) database. The methods resulting from the research will be used to develop an automated process of assembly sequence generation using a three-dimensional (3D) solid drawing in the form of a stacked drawing in a CAD system.
引用
收藏
页码:339 / 350
页数:12
相关论文
共 12 条
[1]   AUTOMATIC COLLISION DETECTION FOR ASSEMBLY SEQUENCE PLANNING USING A THREE-DIMENSIONAL SOLID MODEL [J].
Alfadhlani ;
Samadhi, T. M. A. Ari ;
MA'Ruf, Anas ;
Toha, Isa Setiasyah .
JOURNAL OF ADVANCED MANUFACTURING SYSTEMS, 2011, 10 (02) :277-291
[2]  
Alfadhlani, 2005, P SEM 7 PROD SYST IN, P1
[3]  
Alfadhlani, 2008, JURNAL TEKNIK IND, V10, P124
[4]  
Ariastuti R., 1998, J TEKNIK DAN MANAJEM, V18, P26
[5]   SIMPLIFIED GENERATION OF ALL MECHANICAL ASSEMBLY SEQUENCES [J].
DEFAZIO, TL ;
WHITNEY, DE .
IEEE JOURNAL OF ROBOTICS AND AUTOMATION, 1987, 3 (06) :640-658
[6]  
DELCHAMBRE A, 1992, COMPUTER AIDED ASSEM
[7]   A systematic approach for automatic assembly sequence plan generation [J].
Lai, HY ;
Huang, CT .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2004, 24 (9-10) :752-763
[8]   A novel connector-knowledge-based approach for disassembly precedence constraint generation [J].
Li, JingRong ;
Wang, QingHui ;
Huang, Ping ;
Shen, HongZhou .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (1-4) :293-304
[9]   Improving assembly precedence constraint generation by utilizing motion planning and part interaction clusters [J].
Morato, Carlos ;
Kaipa, Krishnanand N. ;
Gupta, Satyandra K. .
COMPUTER-AIDED DESIGN, 2013, 45 (11) :1349-1364
[10]  
Tickoo S., 2004, SOLID WORKS DESIGNER