Managing IT service management implementation complexity: from the perspective of the Warfield Version of systems science

被引:15
作者
Wan, Jiangping [1 ]
Jones, James D. [2 ]
机构
[1] S China Univ Technol, Sch Business Adm, Dept Decis Sci, Guangzhou 510640, Peoples R China
[2] Liberty Univ, Sch Engn & Computat Sci, Lynchburg, VA 24502 USA
关键词
complexity; mindbugs; risk factors; interpretive structural model; information technology service management; software process improvement; work program of complexity; knowledge support structure; ENTERPRISE; PERFORMANCE; INTEGRATION;
D O I
10.1080/17517575.2011.625572
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The Warfield version of systems science supports a wide variety of application areas, and is useful to practitioners who use the work program of complexity (WPOC) tool. In this article, WPOC is applied to information technology service management (ITSM) for managing the complexity of projects. In discussing the application of WPOC to ITSM, we discuss several steps of WPOC. The discovery step of WPOC consists of a description process and a diagnosis process. During the description process, 52 risk factors are identified, which are then narrowed to 20 key risk factors. All of this is done by interviews and surveys. Root risk factors (the most basic risk factors) consist of 11 kinds of common mindbugs' which are selected from an interpretive structural model. This is achieved by empirical analysis of 25 kinds of mindbugs. (A lesser aim of this research is to affirm that these mindbugs developed from a Western mindset have corresponding relevance in a completely different culture: the Peoples Republic of China.) During the diagnosis process, the relationships among the root risk factors in the implementation of the ITSM project are identified. The resolution step of WPOC consists of a design process and an implementation process. During the design process, issues related to the ITSM application are compared to both e-Government operation and maintenance, and software process improvement. The ITSM knowledge support structure is also designed at this time. During the implementation process, 10 keys to the successful implementation of ITSM projects are identified.
引用
收藏
页码:490 / 522
页数:33
相关论文
共 54 条
[1]   Value-oriented requirements prioritization in a small development organization [J].
Azar, Jim ;
Smith, Randy K. ;
Cordes, David .
IEEE SOFTWARE, 2007, 24 (01) :32-+
[2]   Improving productivity and firm performance with enterprise resource planning [J].
Beheshti, Hooshang M. ;
Beheshti, Cyrus M. .
ENTERPRISE INFORMATION SYSTEMS, 2010, 4 (04) :445-472
[3]   The guide to the software engineering body of knowledge [J].
Bourque, P ;
Dupuis, R ;
Abran, A ;
Moore, JW ;
Tripp, L .
IEEE SOFTWARE, 1999, 16 (06) :35-44
[4]  
Brooks F.P., 2010, Design of Design: Essays from a Computer Scientist
[6]   Measuring the performance of Internet companies using a two-stage data envelopment analysis model [J].
Cao, Xiongfei ;
Yang, Feng .
ENTERPRISE INFORMATION SYSTEMS, 2011, 5 (02) :207-217
[7]   Managing ERP Implementation Failure: A Project Management Perspective [J].
Chen, Charlie C. ;
Law, Chuck C. H. ;
Yang, Samuel C. .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2009, 56 (01) :157-170
[8]   The adaptive approach for storage assignment by mining data of warehouse management system for distribution centres [J].
Chiang, David Ming-Huang ;
Lin, Chia-Ping ;
Chen, Mu-Chen .
ENTERPRISE INFORMATION SYSTEMS, 2011, 5 (02) :219-234
[9]  
Christian K., 2003, ITSM ROAD MAP
[10]   Integrating both Wikis and XML with case bases to facilitate case base development and maintenance [J].
He, Wu ;
Xu, Lida .
EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (07) :8632-8638