Inventory and total completion time minimization for assembly job-shop scheduling considering material integrity and assembly sequential constraint

被引:21
作者
Cheng, Lixin [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
Zhang, Liping [1 ,2 ]
Li, Zixiang [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan, Peoples R China
基金
中国国家自然科学基金;
关键词
Assembly job-shop; Inventory; Lexicographical optimization; Right-shift schedule; Simulated annealing; SIMULATED ANNEALING ALGORITHM; HYBRID GENETIC ALGORITHM; OPTIMIZATION; MODEL;
D O I
10.1016/j.jmsy.2022.10.013
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Assembly job-shop scheduling problems (AJSSP), considering material integrity and assembly sequential constraint (AJSSP-IS), exist widely in rolling stock industries. Production efficiency and inventory levels are the key concerns for this type of industry. Thus, this paper investigates an AJSSP-IS via a lexicographical mixed-integer linear programming (MILP) model and an enhanced simulated annealing algorithm (ESA) to minimize a regular primary objective, the total completion time and an unregular secondary objective, the total inventory time. The lexicographical MILP model is formulated to determine the processing sequence and assembly sequence, and a lexicographical optimization method is applied to obtain the best scheme of a secondary objective from the optimal schemes of a primary objective. Further, an ESA is developed to solve the problem efficiently. In ESA, an assembly-driven initialization is designed to create high-quality solutions by considering assembly relationships; a two-stage decoding is developed in which a semi-active schedule achieves the minimization of the total completion time and a right-shift schedule reduces the total inventory time without extending the total completion time; an improved neighborhood search is proposed by introducing a critical block-oriented selection and a filter selection to increase search efficiency. Experimental results indicate that the lexicographical MILP model can find the lower bound of small-scale problems, and the ESA significantly outperforms six state-of-the-art algorithms in fixing the considered problem.
引用
收藏
页码:660 / 672
页数:13
相关论文
共 48 条
[1]   Multi-objective enhanced memetic algorithm for green job shop scheduling with uncertain times [J].
Afsar, Sezin ;
Jose Palacios, Juan ;
Puente, Jorge ;
Vela, Camino R. ;
Gonzalez-Rodriguez, Ines .
SWARM AND EVOLUTIONARY COMPUTATION, 2022, 68
[2]   The two stage assembly flowshop scheduling problem to minimize total tardiness [J].
Allahverdi, Ali ;
Aydilek, Harun .
JOURNAL OF INTELLIGENT MANUFACTURING, 2015, 26 (02) :225-237
[3]   Mathematical modeling and multi-start search simulated annealing for unequal-area facility layout problem [J].
Allahyari, Maral Zafar ;
Azab, Ahmed .
EXPERT SYSTEMS WITH APPLICATIONS, 2018, 91 :46-62
[4]   Lot streaming for product assembly in job shop environment [J].
Chan, F. T. S. ;
Wong, T. C. ;
Chan, L. Y. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2008, 24 (03) :321-331
[5]   Scheduling in a flexible job shop followed by some parallel assembly stations considering lot streaming [J].
Daneshamooz, Fatemeh ;
Fattahi, Parviz ;
Hosseini, Seyed Mohammad Hassan .
ENGINEERING OPTIMIZATION, 2022, 54 (04) :614-633
[6]   Mathematical modeling and two efficient branch and bound algorithms for job shop scheduling problem followed by an assembly stage [J].
Daneshamooz, Fatemeh ;
Fattahi, Parviz ;
Hosseini, Seyed Mohammad Hassan .
KYBERNETES, 2021, 50 (12) :3222-3245
[7]   A Hybrid Algorithm Based on Particle Swarm Optimization and Artificial Immune for an Assembly Job Shop Scheduling Problem [J].
Du, Hui ;
Liu, Dacheng ;
Zhang, Mian-hao .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
[8]   A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots [J].
Elmi, Atabak ;
Topaloglu, Seyda .
COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (10) :2543-2555
[9]   A new hybrid particle swarm optimization and parallel variable neighborhood search algorithm for flexible job shop scheduling with assembly process [J].
Fattahi, Parviz ;
Rad, Naeeme Bagheri ;
Daneshamooz, Fatemeh ;
Ahmadi, Samad .
ASSEMBLY AUTOMATION, 2020, 40 (03) :419-432
[10]   A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations [J].
Fattahi, Parviz ;
Hosseini, Seyed Mohammad Hassan ;
Jolai, Fariborz ;
Tavakkoli-Moghaddam, Reza .
APPLIED MATHEMATICAL MODELLING, 2014, 38 (01) :119-134