The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia

被引:25
作者
Azman, Mohd Azrai [1 ]
Abdul-Samad, Zulkiflee [2 ]
Ismail, Suraya [2 ]
机构
[1] Univ Teknol MARA UiTM, Fac Architecture Planning & Surveying, Dept Quant Surveying, Kota Samarahan 94300, Sarawak, Malaysia
[2] Univ Malaya, Fac Built Environm, Dept Quant Surveying, Kuala Lumpur 50603, Malaysia
关键词
Public construction; Budget cost estimate; Quantity Surveyors; Tendering; Malaysia; PROJECTS;
D O I
10.1016/j.ijproman.2012.11.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents the accuracy of preliminary cost estimates prepared by Public Works Department (PWD), which is the largest public construction management in Malaysia. It attempts to understand the Quantity Surveyors' (QS) estimation accuracy in relation to public projects. This study analyses 83 projects of estimates and tender bids. The analysis includes three (3) estimating targets i.e. lowest bid, accepted bid and mean of the bids. To broaden the study, 344 QS involved in the procurement answered the questionnaires. Linear multiple regression analysis on project characteristics shows that project size, number of bidders, location and type of schools affect the bias. Contract period affects the consistency. The use of mean of the bids is the best-fit target to explain the bias in terms of adjusted R-2. The accuracy may improve if sufficient design information is available, proper cost planning and improving the application of historical cost data. As an alternative, the phenomenon of overestimation is resulted from government directive instruction, which could challenge the rational of accurate estimate. (C) 2012 Elsevier Ltd. APM and IPMA. All rights reserved.
引用
收藏
页码:994 / 1005
页数:12
相关论文
共 71 条
[21]  
Gunner J., 1999, Engineering, Construction and Architectural Management, V6, P267
[22]  
Halil Faridah Muhamad, 2007, American Journal of Applied Sciences, V4, P1084, DOI 10.3844/ajassp.2007.1084.1089
[23]  
Hamid Sharinah., 2008, Briefing on tender evaluation criteria for electrical contractors
[24]  
Harvey J., 1979, Competitive Bidding on Canadian Public Construction Contracts: Stochastic Analysis for Optimization
[25]  
Herbsman Z., 2006, Management, Quality and Economics in Building, V2nd, P109
[26]  
Hillebrandt P.M., 2000, EC THEORY CONSTRUCTI
[27]  
Ioannou P.G., 1993, J CONSTRUCTION ENG M, V119
[28]  
Karlsen J.T., 2005, Cost Eng., V47, P24
[29]  
Kiew Y.H., 2009, Accuracy of pre-tender cost estimates of quantity surveyor consultants Bachelor of Quantity Surveying with Honours, Universiti Teknologi Malaysia
[30]  
Kumaraswamy MM, 1999, PROCUREMENT SYSTEMS, P228