Adaptive production planning by information sharing for reverse supply chain

被引:0
作者
Murayama, Takeshi [1 ]
Yoda, Mitsunobu [1 ]
Eguchi, Toru [1 ]
Oba, Fuminori [1 ]
机构
[1] Hiroshima Univ, Hiroshima, Japan
来源
Fourth International Symposium on Environmentally Conscious Design and Inverse Manufacturing, Proceedings | 2005年
关键词
production planning; reliability engineering; remanufacturing; reuse; reverse logistics; supply chain management;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper describes a production planning method for a reverse supply chain, in which a disassembly company takes reusable components from returned products, and supplies the reusable components for a product manufacturer. Such a supply chain is faced with an issue that the timings and quantities of returned products and reusable components obtained from them are unknown. The authors propose a method to resolve the issue by sharing information among companies comprising the supply chain. The predicts the quantities of returned products and reusable components by using reliability models. Using the prediction result, each of the companies performs their production planning through the information sharing. The shared information is also used to adjust the reliability models and consequently to make production plans adequate. The flow of the components and products through the supply chain is simulated to show the effectiveness of the method.
引用
收藏
页码:326 / 331
页数:6
相关论文
共 9 条
  • [1] CLEGG AJ, 1995, PROCEEDINGS OF THE 1995 IEEE INTERNATIONAL SYMPOSIUM ON ELECTRONICS AND THE ENVIRONMENT - ISEE, P186, DOI 10.1109/ISEE.1995.514973
  • [2] Quantitative models for reverse logistics: A review
    Fleischmann, M
    BloemhofRuwaard, JM
    Dekker, R
    vanderLaan, E
    vanNunen, JAEE
    VanWassenhove, LN
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 103 (01) : 1 - 17
  • [3] Production planning and control for remanufacturing: a state-of-the-art survey
    Guide, VDR
    Jayaraman, V
    Srivastava, R
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1999, 15 (03) : 221 - 230
  • [4] SCHEDULING DISASSEMBLY
    GUPTA, SM
    TALEB, KN
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1994, 32 (08) : 1857 - 1866
  • [5] ICHIKAWA M, 1990, RELIABILITY ENG, P63
  • [6] MURAYAMA T, 2005, IN PRESS 3 INT C LEA
  • [7] Murayama T., 2000, P 7 CIRP INT SEM LIF, P182
  • [8] Disassembly of complex product structures with parts and materials commonality
    Taleb, KN
    Gupta, SM
    Brennan, L
    [J]. PRODUCTION PLANNING & CONTROL, 1997, 8 (03) : 255 - 269
  • [9] UZOY R, 1997, P 1997 IEEE INT S EL, P285