Determining the Probability of Project Cost Overruns

被引:96
作者
Love, Peter E. D. [1 ]
Wang, Xiangyu [1 ]
Sing, Chun-pong [1 ]
Tiong, Robert L. K. [2 ]
机构
[1] Curtin Univ Technol, Sch Built Environm, Perth, WA 6845, Australia
[2] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore, Singapore
关键词
Australia; Cost overrun; Distribution fitting; Probability; Probability distribution; INFRASTRUCTURE PROJECTS; CONSTRUCTION; REWORK;
D O I
10.1061/(ASCE)CO.1943-7862.0000575
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The statistical characteristics of cost overruns experienced from contract award in 276 Australian construction and engineering projects were analyzed. The skewness and kurtosis values of the cost overruns are computed to determine if the empirical distribution of the data follows a normal distribution. The Kolmogorov-Smirnov, Anderson-Darling, and chi-squared nonparametric tests are used to determine the goodness of fit of the selected probability distributions. A three-parameter Frechet probability function is found to describe the behavior of cost overruns and provide the best overall distribution fit. The Frechet distribution is then used to calculate the probability of a cost overrun being experienced. The statistical characteristics of contract size and cost overruns were also analyzed. The Cauchy (<A$1 million), Wakeby (A$1 to 10 million, <A$101 million) and four-parameter Burr (A$11 to 50 million) tests were found to provide the best distribution fits and used to calculate cost overrun probabilities by contract size. Ascertaining the best fit probability distribution from an empirical distribution at contract award can produce realistic probabilities of cost overruns, which should then be incorporated into a construction cost contingency. DOI: 10.1061/(ASCE)CO.1943-7862.0000575. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:321 / 330
页数:10
相关论文
共 48 条
[41]  
Rowland M., 1981, THESIS GEORG I TECHN
[42]  
Rowlinson S, 1999, PROCUREMENT SYSTEMS, P27
[43]   CONSTRUCTION CLAIMS AND DISPUTES - CAUSES AND COST/TIME OVERRUNS [J].
SEMPLE, C ;
HARTMAN, FT ;
JERGEAS, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (04) :785-795
[44]  
Skarmis M.K., 1997, TRANSPORT POLICY, V4, P141, DOI DOI 10.1016/S0967-070X(97)00007-3
[45]  
Vidalis S.M, 2002, P 4 TRANSP SPEC C CA
[46]  
Western Australia Auditor General, 2010, 5 W AUSTR AUD GEN
[47]  
Western Australia Auditor General, 2011, 1 W AUSTR AUD GEN
[48]  
ZEITOUN A, 1993, 91 U TEX CONSTR IND