Squeezing characteristics of the ground in the Uluabat Tunnel, Turkey, are discussed and the analysis of TBM performance data around zones where the TBM jamming problems occurred is presented. Detailed analysis shows that a squeezing index of the ground can be defined which is related to the change in thrust force, time and length of tunnel where the increase of thrust starts and terminates with squeezing of TBM. This index is found to increase linearly with overburden and although the relationship is not strong, particularly with decreasing RMR values. It is also shown that the delays in tunnel excavation or TBM stoppages also play an important role in the squeezing of TBM shield. It was possible to mitigate the squeezing problem by means of bentonite injection through the shield. As a result, a methodology of predicting critical zones for shield blockage and problems caused by squeezing characteristics of difficult ground is discussed in detail. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:58 / 65
页数:8
相关论文
共 17 条
[1]   THE SQUEEZING POTENTIAL OF ROCKS AROUND TUNNELS - THEORY AND PREDICTION [J].
AYDAN, O ;
AKAGI, T ;
KAWAMOTO, T .
ROCK MECHANICS AND ROCK ENGINEERING, 1993, 26 (02) :137-163
[2]  
Barla G., 2001, TUNNELLING MECH EURO, P169
[3]   Effect of replacing disc cutters with chisel tools on performance of a TBM in difficult ground conditions [J].
Bilgin, Nuh ;
Copur, Hanifi ;
Balci, Cemal .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 27 (01) :41-51
[4]  
Caner E., 2010, THESIS ISTANBUL TU, P133
[5]   Evaluation of ground convergence and squeezing potential in the TBM driven Ghomroud tunnel project [J].
Farrokh, E ;
Mortazavi, A ;
Shamsi, G .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2006, 21 (05) :504-510
[6]   Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project [J].
Farrokh, Ebrahim ;
Rostami, Jamal .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2009, 24 (04) :436-446
[7]  
Hamidi J.K., 2008, P 12 INT C INT ASS C, P3907
[8]  
Hoek E., 2000, TUNNELS TUNNELING IN, V32, P45
[9]  
Hoek E., 2000, Tunnels and Tunnelling International, Part 1, 32/11, 45-51, Part 2, V32/12, P33
[10]   Basic considerations on tunnelling in squeezing ground [J].
Kovari, K ;
Staus, J .
ROCK MECHANICS AND ROCK ENGINEERING, 1996, 29 (04) :203-210