Flexibility study of the Greek power system using a stochastic programming approach for estimating reserve requirements

被引:6
|
作者
Krommydas, Konstantinos F. [1 ,2 ]
Dikaiakos, Christos N. [1 ]
Papaioannou, George P. [1 ]
Stratigakos, Akylas C. [3 ]
机构
[1] Independent Power Transmiss Operator IPTO SA, Res Technol & Dev Dept, Athens 10443, Greece
[2] Univ Patras, Dept Elect & Comp Engn, Rion 26504, Greece
[3] PSL Univ, Ctr Proc Renewable Energy & Energy Syst PERSEE, Mines Paris, F-06904 Sophia Antipolis, France
基金
欧盟地平线“2020”;
关键词
Flexibility; Two stage stochastic unit commitment model; Reliability metrics; WIND POWER; GENERATION; MARKET; TRANSMISSION; ELECTRICITY;
D O I
10.1016/j.epsr.2022.108620
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper presents a detailed flexibility and cost assessment study of the Greek power system for the time period 2021-2025 where for the first time the reserve requirements are determined based on the statistical analysis of the residual load variability and forecast error at hourly steps. In particular, the long-term uncertainties are modeled via forecast scenarios that incorporate different assumptions regarding temperature, load growth, renewable energy sources penetration and hydraulic conditions. In the operational time frame, the net load forecast errors are incorporated via scenarios and a two-stage stochastic unit commitment algorithm with balancing actions is implemented. Forecast error scenarios are generated with a non-parametric approach, using multivariate copula functions to capture the temporal dependencies. A Monte Carlo sampling is used to create uncertainty scenarios and a clustering algorithm to reduce their size. These scenarios are then used as input in the flexibility and cost evaluation study that is subsequently conducted. The study is carried out by solving the unit commitment problem in which all the required technical constraints are considered and then indicative reliability and flexibility metrics are calculated. The two-stage stochastic approach for estimating the reserve requirements is compared with the deterministic approach that has been used from the Greek Transmission System Operator for determining the reserve capacity. The obtained results present great interest, since in both cases the calculated reliability (LOLE) and flexibility metrics (IRRE, flexibility residual) take acceptable values, however in the stochastic approach there is a significant decrease in the system cost. Therefore, through this detailed flexibility study it is shown that the two-stage stochastic approach consists a useful alternative for assessing the reserve requirements of the Greek power system, since decreased operation costs is achieved while security of the system can be established.
引用
收藏
页数:11
相关论文
共 50 条
  • [1] Reserve Requirements for Wind Power Integration: A Scenario-Based Stochastic Programming Framework
    Papavasiliou, Anthony
    Oren, Shmuel S.
    O'Neill, Richard P.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2011, 26 (04) : 2197 - 2206
  • [2] Stochastic programming approach to process flexibility design
    Mak, Ho-Yin
    Shen, Zuo-Jun Max
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2009, 21 (3-4) : 75 - 91
  • [3] Stochastic programming approach to process flexibility design
    Ho-Yin Mak
    Zuo-Jun Max Shen
    Flexible Services and Manufacturing Journal, 2009, 21 : 75 - 91
  • [4] Energy and Reserve Scheduling for Active Distribution System Using Stochastic Programming
    Fang, Maosen
    Chu, Xiaodong
    2017 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2017,
  • [5] A stochastic programming approach to design the production system flexibility considering the evolution of the part families
    Tolio, Tullio
    Valente, Anna
    International Journal of Manufacturing Technology and Management, 2009, 17 (1-2) : 42 - 67
  • [6] Forecasting power system flexibility requirements: A hybrid deep-learning approach
    Coudray, Theotime
    ELECTRIC POWER SYSTEMS RESEARCH, 2025, 241
  • [7] Power system scheduling with fuzzy reserve requirements
    Guan, XH
    Luh, PB
    Prasannan, B
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1996, 11 (02) : 864 - 869
  • [8] Power system scheduling with fuzzy reserve requirements
    Xian Jiaotong Univ, Shaanxi, China
    IEEE Trans Power Syst, 2 (864-869):
  • [9] Stochastic Models in Risk-based Assessment of Reserve Requirements for a Power System with High Wind Power Generation
    Negnevitsky, Michael
    Dinh Hieu Nguyen
    Piekutowski, Marian
    2016 SECOND INTERNATIONAL SYMPOSIUM ON STOCHASTIC MODELS IN RELIABILITY ENGINEERING, LIFE SCIENCE AND OPERATIONS MANAGEMENT (SMRLO), 2016, : 136 - 143
  • [10] A stochastic integer programming approach to reserve staff scheduling with preferences
    Perreault-Lafleur, Carl
    Carvalho, Margarida
    Desaulniers, Guy
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2025, 32 (01) : 289 - 313