A Multi-Objective Identical Parallel Machine Scheduling with Setup and Removal Times with Deteriorating and Learning Effects

被引:0
|
作者
Amini, A. [1 ]
Tavakkoli-Moghaddam, R. [1 ]
Niakan, F. [1 ]
机构
[1] Univ Tehran, Dept Ind Engn, Coll Engn, Tehran, Iran
来源
2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM) | 2011年
关键词
parallel machine scheduling; setup time; removal time; learning effect; deteriorating job; JOBS;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers an identical parallel machine scheduling problem when there are position-based deteriorating jobs with setup and removal times that are affected by the position-based learning effect. The aim of the problem is to minimize the sum of the total tardiness and earliness, minimize the number of tardy jobs and minimize the mean completion times. As a result, the mathematical model is developed for the above-mentioned problem. Since this problem belongs to NP-hard classes, three heuristic methods, namely shortest processing time (SPT), earliest due date (EDD) and longest processing time (LPT), are developed. Furthermore, some numerical experiments are designed to compare the performance of these different methods.
引用
收藏
页码:1271 / 1274
页数:4
相关论文
共 50 条
  • [41] Identical parallel machine scheduling with time-dependent processing times
    Ouazene, Yassine
    Yalaoui, Farouk
    THEORETICAL COMPUTER SCIENCE, 2018, 721 : 70 - 77
  • [42] On the scheduling with past-sequence-dependent setup times and learning effects on a single machine
    Soroush, H. M.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12) : 2483 - 2487
  • [43] Multi-Objective Parallel Machine Scheduling with Eligibility Constraints for the Kitting of Metal Structural Parts
    Zhu, Xiaofei
    Xu, Jiazhong
    Ge, Jianghua
    Wang, Yaping
    Xie, Zhiqiang
    MACHINES, 2022, 10 (10)
  • [44] On the scheduling with past-sequence-dependent setup times and learning effects on a single machine
    H. M. Soroush
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 2483 - 2487
  • [45] Multicriteria scheduling with controllable processing times, setup times, and learning, ageing and deterioration effects on a single machine
    Soroush, H. M.
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2016, 10 (04) : 455 - 478
  • [46] Single machine scheduling with past-sequence-dependent setup times and learning effects
    Kuo, Wen-Hung
    Yang, Dar-Li
    INFORMATION PROCESSING LETTERS, 2007, 102 (01) : 22 - 26
  • [47] Scheduling with past-sequence-dependent setup times and learning effects on a single machine
    Xue-Ru Wang
    Ji-Bo Wang
    Wen-Jun Gao
    Xue Huang
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 739 - 746
  • [48] Scheduling with past-sequence-dependent setup times and learning effects on a single machine
    Wang, Xue-Ru
    Wang, Ji-Bo
    Gao, Wen-Jun
    Huang, Xue
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (5-8) : 739 - 746
  • [49] Fuzzy bi-objective formulation for a parallel machine scheduling problem with machine eligibility restrictions and sequence-dependent setup times
    Naderi-Beni, Mahdi
    Ghobadian, Ehsan
    Ebrahimnejad, Sadoullah
    Tavakkoli-Moghaddam, Reza
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (19) : 5799 - 5822
  • [50] A metaheuristic algorithm and simulation to study the effect of learning or tiredness on sequence-dependent setup times in a parallel machine scheduling problem
    Exposito-Izquierdo, Christopher
    Angel-Bello, Francisco
    Melian-Batista, Belen
    Alvarez, Ada
    Baez, Sarahi
    EXPERT SYSTEMS WITH APPLICATIONS, 2019, 117 : 62 - 74