A Multi-Objective Identical Parallel Machine Scheduling with Setup and Removal Times with Deteriorating and Learning Effects

被引:0
|
作者
Amini, A. [1 ]
Tavakkoli-Moghaddam, R. [1 ]
Niakan, F. [1 ]
机构
[1] Univ Tehran, Dept Ind Engn, Coll Engn, Tehran, Iran
来源
2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM) | 2011年
关键词
parallel machine scheduling; setup time; removal time; learning effect; deteriorating job; JOBS;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers an identical parallel machine scheduling problem when there are position-based deteriorating jobs with setup and removal times that are affected by the position-based learning effect. The aim of the problem is to minimize the sum of the total tardiness and earliness, minimize the number of tardy jobs and minimize the mean completion times. As a result, the mathematical model is developed for the above-mentioned problem. Since this problem belongs to NP-hard classes, three heuristic methods, namely shortest processing time (SPT), earliest due date (EDD) and longest processing time (LPT), are developed. Furthermore, some numerical experiments are designed to compare the performance of these different methods.
引用
收藏
页码:1271 / 1274
页数:4
相关论文
共 50 条
  • [31] Parallel machines scheduling with deteriorating and learning effects
    Xue Huang
    Ming-Zheng Wang
    Ping Ji
    Optimization Letters, 2014, 8 : 493 - 500
  • [32] A hybrid metaheuristic algorithm for a parallel machine scheduling problem with dependent setup times
    Baez, Sarahi
    Angel-Bello, Francisco
    Alvarez, Ada
    Melian-Batista, Belen
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 131 : 295 - 305
  • [33] The single machine scheduling problem with setup times under an extension of the general learning and forgetting effects
    Mustu, Settar
    Eren, Tamer
    OPTIMIZATION LETTERS, 2021, 15 (04) : 1327 - 1343
  • [34] The single machine scheduling problem with setup times under an extension of the general learning and forgetting effects
    Settar Muştu
    Tamer Eren
    Optimization Letters, 2021, 15 : 1327 - 1343
  • [35] Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Huang, Yi-Chi
    Lee, Wen-Chiung
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (12) : 1760 - 1765
  • [36] Resource-dependent scheduling with deteriorating jobs and learning effects on unrelated parallel machine
    Yuan-Yuan Lu
    Jian Jin
    Ping Ji
    Ji-Bo Wang
    Neural Computing and Applications, 2016, 27 : 1993 - 2000
  • [37] Resource-dependent scheduling with deteriorating jobs and learning effects on unrelated parallel machine
    Lu, Yuan-Yuan
    Jin, Jian
    Ji, Ping
    Wang, Ji-Bo
    NEURAL COMPUTING & APPLICATIONS, 2016, 27 (07) : 1993 - 2000
  • [38] Metaheuristics for solving a multi-objective flow shop scheduling problem with sequence-dependent setup times
    Anjana, V.
    Sridharan, R.
    Kumar, P. N.
    JOURNAL OF SCHEDULING, 2020, 23 (01) : 49 - 69
  • [39] Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects
    Yeh, Wei-Chang
    Lai, Peng-Jen
    Lee, Wen-Chiung
    Chuang, Mei-Chi
    INFORMATION SCIENCES, 2014, 269 : 142 - 158
  • [40] Unrelated parallel machine scheduling with setup times using simulated annealing
    Kim, DW
    Kim, KH
    Jang, W
    Chen, FF
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2002, 18 (3-4) : 223 - 231