Strategic-operational construction management: Hybrid system dynamics and discrete event approach

被引:76
作者
Pena-Mora, Feniosky [1 ]
Han, Sangwon [1 ]
Lee, SangHyun [2 ]
Park, Moonseo [3 ]
机构
[1] Univ Illinois, Dept Civil & Environm Engn, Urbana, IL 61801 USA
[2] Univ Alberta, Hole Sch Construct Engn, Dept Civil & Environm Engn, Edmonton, AB T6G 2G7, Canada
[3] Seoul Natl Univ, Dept Architecture, Seoul 151742, South Korea
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2008年 / 134卷 / 09期
基金
美国国家科学基金会;
关键词
D O I
10.1061/(ASCE)0733-9364(2008)134:9(701)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A significant number of large-scale civil infrastructure projects experience cost overruns and schedule delays. To minimize these disastrous consequences, management actions need to be carefully examined at both the strategic and operational levels, as their effectiveness is mainly dependent on how well strategic perspectives and operational details of a project are balanced. However, current construction project management approaches have treated the strategic and operational issues separately, and consequently introduced a potential conflict between strategic and operational analyses. To address this issue, a hybrid simulation model is presented in this paper. This hybrid model combines system dynamics and discrete event simulation which have mainly been utilized to analyze the strategic and operational issues in isolation, respectively. As an application example, a nontypical repetitive earthmoving process is selected and simulated. The simulation results demonstrate that a systematic integration of strategic perspective and operational details is helpful to enhance the process performance by enabling construction managers to identify potential process improvement areas that traditional approaches may miss. Based on the simulation results, it is concluded that the proposed hybrid simulation model has great potential to support both the strategic and operational aspects of construction project management and to ultimately help increase project performance.
引用
收藏
页码:701 / 710
页数:10
相关论文
共 31 条
[1]   Simplifying simulation modeling through integration with 3D CAD [J].
AbouRizk, S ;
Mather, K .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (06) :475-483
[2]  
[Anonymous], 2002, RESPONSE SURFACE MET
[3]  
Callahan K., 2004, ESSENTIALS STRATEGIC
[4]  
El-Rayes K., 1998, Journal of Construction Management and Economics, V16, P433
[5]   SIMULATION VERIFIES QUEUING PROGRAM FOR SELECTING LOADER-TRUCK FLEETS [J].
FARID, F ;
KONING, TL .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (02) :386-404
[6]   How common and how large are cost overruns in transport infrastructure projects? [J].
Flyvbjerg, B ;
Holm, MKS ;
Buhl, SL .
TRANSPORT REVIEWS, 2003, 23 (01) :71-88
[7]  
*GAO, 2002, GAO02702T
[8]  
*GAO, 2005, GAO05673
[9]  
*IM INC, 2002, EXT 5 0 SOFTW
[10]  
KELLEHER AH, 2004, THESIS STATE U BLACK