APPLICABILITY OF DIFFERENT LINE BALANCING METHODS IN THE PRODUCTION OF APPAREL

被引:0
|
作者
Guner, Mucella [1 ]
Yucel, Onder [2 ]
Unal, Can [3 ]
机构
[1] Ege Univ, Dept Text Engn, Izmir, Turkey
[2] Ege Univ, Bayindir Vocat Training Sch, Izmir, Turkey
[3] Namik Kemal Univ, Dept Text Engn, Corlu, Turkey
来源
TEKSTIL VE KONFEKSIYON | 2013年 / 23卷 / 01期
关键词
Line balancing; Apparel; Work flow; Cycle time; Work station;
D O I
暂无
中图分类号
TB3 [工程材料学]; TS1 [纺织工业、染整工业];
学科分类号
0805 ; 080502 ; 0821 ;
摘要
In today's competitive environment, it is known that businesses should make production processes more efficient and flexible to improve competitive powers in global markets. Line balancing problem is one of the important problems for the manufacturing sectors. Especially labor-intensive productions, such as apparel sector this situation is more evident. Production line balancing is of great importance in apparel manufacturing processes which works a large number of employees. In this study, five different methods used in production line balancing were analyzed using t-shirt model being manufacturing in an apparel factory. When the efficiencies of line balancing methods were investigated, values of 5 different methods were found the same. The different results could not be obtained due to having less operation steps of t-shirt production. Additionally, the results of line balancing methods applied to the production line were compared with the result of improving method.
引用
收藏
页码:77 / 84
页数:8
相关论文
共 50 条