An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations

被引:59
作者
Kellegoz, Talip [1 ]
Toklu, Bilal [2 ]
机构
[1] Gazi Univ, Dept Ind Engn, Fac Technol, Ankara, Turkey
[2] Gazi Univ, Dept Ind Engn, Fac Engn, Ankara, Turkey
关键词
Assembly line balancing; Parallel multi-manned stations; Lower bounding; Branch and bound algorithm; COLONY OPTIMIZATION ALGORITHM; GENETIC ALGORITHM; MODEL; DESIGN; STATIONS; SERIAL;
D O I
10.1016/j.cor.2012.04.019
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In the event that big-sized complex products (containing a large number of assembly tasks most of which have long task times) are produced in simple or two-sided assembly lines, hundreds of stations are essentially required. Long product flow time, a large area for establishment of the line, a high budget for the investment of equipment, and tools in stations and several work-in-process are also required for these kinds of products. In order to avoid these disadvantages, assembly lines with parallel multi-manned workstations can be utilized. In this paper, these lines and one of their balancing problems are addressed, and a branch and bound algorithm is proposed. The algorithm is composed of a branching scheme, some efficient dominance and feasibility criteria based on a problem-specific knowledge. A heuristic-based guidance for enumeration process is included as an efficient component of the algorithm as well. VWSolver algorithm proposed for a special version of the problem in the literature has been modified and compared with the proposed algorithm. Results show that proposed algorithm outperforms VWSolver in terms of both CPU times and quality of feasible solutions found. (c) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3344 / 3360
页数:17
相关论文
共 58 条
[1]   A METHOD FOR ASSEMBLY LINE BALANCING WITH MORE THAN ONE WORKER IN EACH STATION [J].
AKAGI, F ;
OSAKI, H ;
KIKUCHI, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1983, 21 (05) :755-770
[2]   A hybrid genetic algorithm for mixed model assembly line balancing problem with parallel workstations and zoning constraints [J].
Akpinar, Sener ;
Bayhan, G. Mirac .
ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2011, 24 (03) :449-457
[3]   A parallel station heuristic for the mixed-model production line balancing problem [J].
Askin, RG ;
Zhou, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) :3095-3105
[5]   BALANCING 2-SIDED ASSEMBLY LINES - A CASE-STUDY [J].
BARTHOLDI, JJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) :2447-2461
[6]   Two-sided assembly line balancing using an ant-colony-based heuristic [J].
Baykasoglu, Adil ;
Dereli, Tuerkay .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (5-6) :582-588
[7]   Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure [J].
Becker, Christian ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (02) :359-374
[8]   A network model for parallel line balancing problem [J].
Benzer, Recep ;
Goekcen, Hadi ;
Cetinyokus, Tahsin ;
Cercioglu, Hakan .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2007, 2007
[9]  
Bukchin J, 2004, EUR J OPER RES, V156, P326, DOI [10.1016/S0377-2217(03)00054-7, 10.1016/s0377-2217(03)00054-7]
[10]   Team-oriented assembly system design: A new approach [J].
Bukchin, J ;
Darel, E ;
Rubinovitz, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 51 (1-2) :47-57