Scheduling with due date assignment under special conditions on job processing

被引:59
作者
Gordon, Valery
Strusevich, Vitaly [1 ]
Dolgui, Alexandre [2 ]
机构
[1] Univ Greenwich, Old Royal Naval Coll, Sch Comp & Math Sci, London SE10 9LS, England
[2] Ind Engn & Comp Sci Ctr, Ecole Mines St Etienne, F-42023 St Etienne 2, France
关键词
Scheduling; Due date assignment; Precedence constraints; Deterioration; Learning; Maintenance activity; RATE-MODIFYING ACTIVITY; OF-THE-ART; SINGLE-MACHINE; PRECEDENCE CONSTRAINTS; MODULAR DECOMPOSITION; SEQUENCING PROBLEMS; DETERIORATING JOBS; WINDOW ASSIGNMENT; CONTROLLABLE RELEASE; MAINTENANCE ACTIVITY;
D O I
10.1007/s10951-011-0240-2
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We review the results on scheduling with due date assignment under such conditions on job processing as given precedence constraints, maintenance activity or various scenarios of processing time changing. The due date assignment and scheduling problems arise in production planning when the management is faced with setting realistic due dates for a number of jobs. Most research on scheduling with due date assignment is focused on optimal sequencing of independent jobs. However, it is often found in practice that some products are manufactured in a certain order implied, for example, by technological, marketing or assembly requirements and this can be modeled by imposing precedence constraints on the set of jobs. In classical deterministic scheduling models, the processing conditions, including job processing times, are usually viewed as given constants. In many real-life situations, however, the processing conditions may vary over time, thereby affecting actual durations of jobs. In the models with controllable processing times, the scheduler can speed up job execution times by allocating some additional resources to the jobs. In the models with deterioration or learning, the actual processing time can depend either on the position or on the start time of a job in the schedule. In scheduling with deterioration, the later a job starts, the longer it takes to process, while in scheduling with learning, the actual processing time of a job gets shorter, provided that the job is scheduled later. We consider also scheduling models with optional maintenance activity. In manufacturing processing, production scheduling with preventive maintenance planning is one of the most significant methods in preventing the machinery from failure or wear.
引用
收藏
页码:447 / 456
页数:10
相关论文
共 70 条