共 30 条
[2]
[Anonymous], ILOG CPLEX
[3]
APPLYING NEW SCHEDULING THEORY TO STATIC PRIORITY PREEMPTIVE SCHEDULING
[J].
SOFTWARE ENGINEERING JOURNAL,
1993, 8 (05)
:284-292
[5]
Awan MA, 2013, IEEE REAL TIME, P205, DOI 10.1109/RTAS.2013.6531093
[6]
Brucker P, 2010, CH CRC COMP SCI SER, P1
[7]
Processor design for portable systems
[J].
JOURNAL OF VLSI SIGNAL PROCESSING SYSTEMS FOR SIGNAL IMAGE AND VIDEO TECHNOLOGY,
1996, 13 (2-3)
:203-221
[10]
Chen J.-J., 2009, Parallel and Distributed Processing Symposium, International, P1, DOI DOI 10.1109/IPDPS.2009.5161024