Solving software project scheduling problems with ant colony optimization

被引:67
作者
Xiao, Jing [1 ]
Ao, Xian-Ting [2 ]
Tang, Yong [1 ]
机构
[1] S China Normal Univ, Sch Comp Sci, Guangzhou, Guangdong, Peoples R China
[2] Sun Yat Sen Univ, Dept Comp Sci, Guangzhou 510275, Guangdong, Peoples R China
关键词
Scheduling; Automatic software management; Software project scheduling; Ant colony optimization; GENETIC ALGORITHM; CLASSIFICATION; SYSTEM;
D O I
10.1016/j.cor.2012.05.007
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Software project scheduling problem (SPSP) is one of the important and challenging problems faced by the software project managers in the highly competitive software industry. As the problem is becoming an NP-hard problem with the increasing numbers of employees and tasks, only a few algorithms exist and the performance is still not satisfying. To design an effective algorithm for SPSP, this paper proposes an ant colony optimization (ACO) approach which is called ACS-SPSP algorithm. Since a task in software projects involves several employees, in this paper, by splitting tasks and distributing dedications of employees to task nodes we get the construction graph for ACO. Six domain-based heuristics are designed to consider the factors of task efforts, allocated dedications of employees and task importance. Among these heuristic strategies, the heuristic of allocated dedications of employees to other tasks performs well. ACS-SPSP is compared with a genetic algorithm to solve the SPSP on 30 random instances. Experimental results show that the proposed algorithm is promising and can obtain higher hit rates with more accuracy compared to the previous genetic algorithm solution. (C) 2012 Elsevier Ltd. All rights reserved.
引用
收藏
页码:33 / 46
页数:14
相关论文
共 32 条
[1]   An Evolutionary Squeaky Wheel Optimization Approach to Personnel Scheduling [J].
Aickelin, Uwe ;
Burke, Edmund K. ;
Li, Jingpeng .
IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2009, 13 (02) :433-443
[2]   Software project management with GAs [J].
Alba, Enrique ;
Chicano, J. Francisco .
INFORMATION SCIENCES, 2007, 177 (11) :2380-2401
[3]   Staffing a software project: A constraint satisfaction and optimization-based approach [J].
Barreto, Ahilton ;
Barros, Marcio de O. ;
Werner, Claudia M. L. .
COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (10) :3073-3089
[4]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[5]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[6]   Time-line based model for software project scheduling with genetic algorithms [J].
Chang, Carl K. ;
Jiang, Hsin-yi ;
Di, Yu ;
Zhu, Dan ;
Ge, Yujia .
INFORMATION AND SOFTWARE TECHNOLOGY, 2008, 50 (11) :1142-1154
[7]   Genetic algorithms for project management [J].
Chang, CK ;
Christensen, MJ ;
Zhang, T .
ANNALS OF SOFTWARE ENGINEERING, 2001, 11 :107-139
[8]  
Chao C, 1994, THESIS U ILLINOIS CH
[9]   An efficient hybrid algorithm for resource-constrained project scheduling [J].
Chen, Wang ;
Shi, Yan-jun ;
Teng, Hong-fei ;
Lan, Xiao-ping ;
Hu, Li-chen .
INFORMATION SCIENCES, 2010, 180 (06) :1031-1039
[10]   Optimizing Discounted Cash Flows in Project Scheduling-An Ant Colony Optimization Approach [J].
Chen, Wei-Neng ;
Zhang, Jun ;
Chung, Henry Shu-Hung ;
Huang, Rui-Zhang ;
Liu, Ou .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS, 2010, 40 (01) :64-77