Balancing and scheduling of flexible mixed model assembly lines with parallel stations

被引:17
作者
Ozturk, Cemalettin [1 ]
Tunali, Semra [2 ]
Hnich, Brahim [3 ]
Ornek, Arslan [1 ]
机构
[1] Izmir Univ Econ, Dept Ind Syst Engn, Izmir, Turkey
[2] Izmir Univ Econ, Dept Business Adm, Izmir, Turkey
[3] Izmir Univ Econ, Dept Comp Engn, Izmir, Turkey
关键词
Mixed model assembly lines; Balancing; Scheduling; Flexible manufacturing; Mixed integer programming; SYSTEM; ALGORITHMS; DESIGN;
D O I
10.1007/s00170-012-4675-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we study flexible mixed model assembly lines with serially connected stages where stages may have one or more parallel stations. Station parallelism in flexible mixed model assembly lines improves system reliability and enables rapid adaptability to customer demand fluctuations. However, in order to effectively manage such lines under real-world conditions, there is a need to extend traditional assembly line management methods. This study extends the current research by simultaneously considering the problems of task assignment and model scheduling on parallel stations. Furthermore, scheduling of assigned tasks on each station is considered. We formulate the problem context first as a mixed integer programming model and then develop a decomposition scheme for large scale applications. Finally, we compare the performance of the proposed model and decomposition scheme using various size test instances.
引用
收藏
页码:2577 / 2591
页数:15
相关论文
共 47 条
[1]   Concurrent operations assignment and sequencing for particular assembly problems in flow lines [J].
Agnetis, A ;
Arbib, C .
ANNALS OF OPERATIONS RESEARCH, 1997, 69 (0) :1-31
[2]   A review of the current applications of genetic algorithms in mixed-model assembly line sequencing [J].
Akgunduz, Onur Serkan ;
Tunali, Semra .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (15) :4483-4503
[3]   Balancing and scheduling tasks in assembly lines with sequence-dependent setup times [J].
Andres, Carlos ;
Miralles, Cristobal ;
Pastor, Rafael .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :1212-1223
[4]  
[Anonymous], 2012, Scheduling
[5]   A parallel station heuristic for the mixed-model production line balancing problem [J].
Askin, RG ;
Zhou, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (11) :3095-3105
[6]  
Baptiste P., 2001, Constraint-Based Scheduling: Applying Constraint Programming to Scheduling Problems
[7]   A survey on problems and methods in generalized assembly line balancing [J].
Becker, C ;
Scholl, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (03) :694-715
[8]   Balancing assembly lines with variable parallel workplaces: Problem definition and effective solution procedure [J].
Becker, Christian ;
Scholl, Armin .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 199 (02) :359-374
[9]  
Benzer R, 2007, NETWORK MODEL PARALL
[10]   Assembly line balancing: Which model to use when? [J].
Boysen, Nils ;
Fliedner, Malte ;
Scholl, Armin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 111 (02) :509-528