Parallel machine scheduling with additional resources: Notation, classification, models and solution methods

被引:130
作者
Edis, Emrah B. [1 ]
Oguz, Ceyda [2 ]
Ozkarahan, Irem [3 ]
机构
[1] Celal Bayar Univ, Dept Ind Engn, TR-45140 Manisa, Turkey
[2] Koc Univ, Coll Engn, TR-34450 Istanbul, Turkey
[3] Troy Univ, Montgomery, AL 36104 USA
关键词
Scheduling; Parallel machines; Additional resources; Integer programming; DEDICATED MACHINES; SECONDARY RESOURCE; ALGORITHMS; TIME; SUBJECT; TASKS; CONSTRAINTS; PROCESSORS; HEURISTICS; MINIMIZE;
D O I
10.1016/j.ejor.2013.02.042
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Majority of parallel machine scheduling studies consider machine as the only resource. However, in most real-life manufacturing environments, jobs may require additional resources, such as automated guided vehicles, machine operators, tools, pallets, dies, and industrial robots, for their handling and processing. This paper presents a review and discussion of studies on the parallel machine scheduling problems with additional resources. Papers are surveyed in five main categories: machine environment, additional resource, objective functions, complexity results and solution methods, and other important issues. The strengths and weaknesses of the literature together with open areas for future studies are also emphasized. Finally, extensions of integer programming models for two main classes of related problems are given and conclusions are drawn based on computational studies. (C) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:449 / 463
页数:15
相关论文
共 65 条
[1]  
[Anonymous], 2012, Scheduling
[2]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[3]  
BLAZEWICZ J, 1983, OPER RES LETT, V2, P80, DOI 10.1016/0167-6377(83)90042-1
[4]   DEADLINE SCHEDULING OF TASKS WITH READY TIMES AND RESOURCE CONSTRAINTS [J].
BLAZEWICZ, J .
INFORMATION PROCESSING LETTERS, 1979, 8 (02) :60-63
[5]   SCHEDULING TASKS ON 2 PROCESSORS WITH DEADLINES AND ADDITIONAL RESOURCES [J].
BLAZEWICZ, J ;
BARCELO, J ;
KUBIAK, W ;
ROCK, H .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1986, 26 (03) :364-370
[6]   MINIMIZING MEAN FLOW-TIME WITH PARALLEL PROCESSORS AND RESOURCE CONSTRAINTS [J].
BLAZEWICZ, J ;
KUBIAK, W ;
ROCK, H ;
SZWARCFITER, J .
ACTA INFORMATICA, 1987, 24 (05) :513-524
[7]   ALGORITHMS FOR MINIMIZING MAXIMUM LATENESS WITH UNIT LENGTH TASKS AND RESOURCE CONSTRAINTS [J].
BLAZEWICZ, J ;
KUBIAK, W ;
MARTELLO, S .
DISCRETE APPLIED MATHEMATICS, 1993, 42 (2-3) :123-138
[8]  
BLAZEWICZ J, 1981, EUR J OPER RES, V6, P75, DOI 10.1016/0377-2217(81)90331-3
[9]  
Blazewicz J., 2007, HDB SCHEDULING
[10]  
Blazewicz J., 1989, ADV PROJECT SCHEDULI, P225