PRAC: A Software System to Solve the Resource-constrained Project Scheduling Problem

被引:0
|
作者
Zhang, Mao-sheng [1 ]
Zhao, Ying [1 ]
Cao, Bo [2 ]
机构
[1] Tsinghua Univ, Dept Comp Sci & Technol, Beijing 100084, Peoples R China
[2] Tsinghua Univ, Dept Ind Engn, Beijing 100084, Peoples R China
来源
2016 INTERNATIONAL CONFERENCE ON BUSINESS AND MANAGEMENT (ICBM 2016) | 2016年
关键词
Project scheduling problem; Resource-constrained; Software system; MANAGEMENT;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper reports on a software system which focuses on the solution approach for the classic resource-constrained project scheduling problem (RCPSP). This problem aims at the construction of a precedence and resource feasible project schedule with a minimal project duration. Our system allows project managers to design their project by editing activities and resources, exhibiting structure by Gantt chart and optimizing project schedule by Particle Swarm Optimization Algorithm (PSO). Furthermore, we implement a simulation model which can help project managers to adjust the schedule accordingly and can effectively avoid uncertain risks.
引用
收藏
页码:37 / 42
页数:6
相关论文
共 50 条
  • [1] Stochastic rollout and justification to solve the resource-constrained project scheduling problem
    Xu, Ningxiong
    Nozick, Linda
    Bernstein, Orr
    Jones, Dean
    PROCEEDINGS OF THE 2007 WINTER SIMULATION CONFERENCE, VOLS 1-5, 2007, : 1799 - 1806
  • [2] Using an Enhanced Ant Colony System to Solve Resource-Constrained Project Scheduling Problem
    Chen, Ruey-Maw
    Lo, Shih-Tang
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2006, 6 (11): : 75 - 84
  • [3] Fuzzy Resource-Constrained Project Scheduling Problem for Software Development
    WANG Xianggang1
    2. State Key Laboratory of Software Engineering
    WuhanUniversityJournalofNaturalSciences, 2010, 15 (01) : 25 - 30
  • [4] Meta-heuristic Techniques to Solve Resource-Constrained Project Scheduling Problem
    Roy, Bidisha
    Sen, Asim Kumar
    INTERNATIONAL CONFERENCE ON INNOVATIVE COMPUTING AND COMMUNICATIONS, VOL 2, 2019, 56 : 93 - 99
  • [5] An Efficient Relax-and-Solve Algorithm for the Resource-Constrained Project Scheduling Problem
    Etminaniesfahani, Alireza
    Gu, Hanyu
    Salehipour, Amir
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON OPERATIONS RESEARCH AND ENTERPRISE SYSTEMS (ICORES), 2021, : 271 - 277
  • [6] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [7] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [8] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [9] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [10] A Forward–Backward Relax-and-Solve Algorithm for the Resource-Constrained Project Scheduling Problem
    Etminaniesfahani A.
    Gu H.
    Naeni L.M.
    Salehipour A.
    SN Computer Science, 4 (2)