ASSESSMENT OF SUPPLIER RISK FOR COPPER PROCUREMENT

被引:3
作者
Buzdogan-Lindenmayr, Ezgi [1 ]
Kara, Guray [2 ]
Selcuk-Kestel, A. Sevtap [2 ]
机构
[1] Albert Ludwig Univ Freiburg, Freiburg, Germany
[2] Middle East Tech Univ, Inst Appl Math, Ankara, Turkey
来源
COMMUNICATIONS FACULTY OF SCIENCES UNIVERSITY OF ANKARA-SERIES A1 MATHEMATICS AND STATISTICS | 2019年 / 68卷 / 01期
关键词
Procurement process; risk management; risk matrix; total probability theorem; supplier risk; copper;
D O I
10.31801/cfsuasmas.501491
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
Procurement risk management (PRM) requires a good understanding and assessment of all potential risks. As the procurement industry mostly functions globally and the supply-demand chain forms a dependency structure among all interested parties, the quantification of risks related to the suppliers gain importance. This study presents a systematic PRM to evaluate and quantify the risks of a commodity associated to its suppliers. The probabilistic set up using total probability theorem on the information collected using risk management tools, such as expert opinion, charts, survey and historical realizations are imposed to quantify the risks. The resulting probabilities are utilized to construct a risk matrix which illustrates the performance of each supplier at every potential risk source. An application to a copper procurement as case study is done based on the risk management process evaluation. The quantification of the supplier's risk with respect to a risk ranking illustration in copper procurement is exposed to indicate the effectiveness of the methodology and the necessity of such evaluation in decision making.
引用
收藏
页码:1045 / 1060
页数:16
相关论文
共 18 条
[1]  
AON, 2009, DEF REP RISK AONS 20
[2]   A fuzzy-based integrated framework for supply chain risk assessment [J].
Aqlan, Faisal ;
Lam, Sarah S. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 161 :54-63
[3]  
Ayyub M., 2003, RISK ANAL ENG EC
[4]  
Buzdogan E., 2009, THESIS
[5]   Supply chain operational risk mitigation: a collaborative approach [J].
Chen, Jie ;
Sohal, Amrik S. ;
Prajogo, Daniel I. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (07) :2186-2199
[6]   CORPORATE-PLANNING AND PROCUREMENT IN MULTINATIONAL FIRMS [J].
FARMER, D .
INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & MATERIALS MANAGEMENT, 1981, 11 (2-3) :36-45
[7]  
Foroughi A., 2006, PICMET 2006 Technology Management for the Global Future, P2732
[8]  
Frame J.D., 2003, Managing risk in organizations: A guide for managers
[9]  
Holmes A., 2002, Risk Management
[10]  
Hutchins D.C., 1999, JUST IN TIME