Determination of number of kanban in a cellular manufacturing system with considering rework process

被引:11
作者
Aghajani, Mojtaba [1 ]
Keramati, Abbas [1 ]
Javadi, Babak [1 ]
机构
[1] Univ Tehran, Dept Ind Engn, Fac Engn, Tehran, Iran
关键词
Kanban; Cellular manufacturing system; Rework; Mixed integer non-linear programming (MINLP); Particle swarm optimization; Simulated annealing; PARTICLE SWARM OPTIMIZATION; SUPPLY CHAIN SYSTEM; REPLENISHMENT POLICY; IMMUNE ALGORITHM; EMQ MODEL; DESIGN; PRODUCTS; FAILURE;
D O I
10.1007/s00170-012-3973-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The main element of just-in-time production system is kanban and the number of kanban influences the product inventory level. This research studies the cellular manufacturing system controlled by kanban mechanism which defective items are produced in any production run of each product and rework is carried out to transform them into serviceable items. In each cycle after the normal production of each product, the machine is setup for the rework process. In this paper, a mixed-integer nonlinear programming (MINLP) model in order to minimize total cost was developed to determine number of kanban, batch size, and number of batches. To avoid the large computational time in optimal solution, a particle swarm optimization (PSO) and simulated annealing (SA) algorithms as metaheuristic methods are used for solving a large MINLP. Some problems are solved by PSO and SA and performance of the PSO and the SA is evaluated by comparing their results with the optimal solution. It is shown that both PSO and SA result in a near-optimal solution but the PSO algorithm gives a better performance than the SA method.
引用
收藏
页码:1177 / 1189
页数:13
相关论文
共 49 条
[1]  
[Anonymous], JUST TIME
[2]  
[Anonymous], 1995, 1995 IEEE INT C
[3]   Applying simulated annealing to cellular manufacturing system design [J].
Arkat, Jamal ;
Saidi, Mohammad ;
Abbasi, Babak .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 32 (5-6) :531-536
[4]   A hybrid GA-simulation approach to improve JIT systems [J].
Azadeh, A. ;
Ebrahimipour, V. ;
Bavar, P. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (08) :2323-2344
[5]   DETERMINING THE NUMBER OF KANBANS IN A MULTIPRODUCT, MULTISTAGE PRODUCTION SYSTEM [J].
BARD, JF ;
GOLANY, B .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (05) :881-895
[6]   Effects of imperfect products on lot sizing with work in process inventory [J].
Barzoki, Morteza Rasti ;
Jahanbazi, Morteza ;
Bijari, Mehdi .
APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (21) :8328-8336
[7]   Optimal batch quantity models for a lean production system with in-cycle rework and scrap [J].
Biswas, Pablo ;
Sarker, Bhaba R. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (23) :6585-6610
[8]   A MATHEMATICAL-PROGRAMMING APPROACH TO A DETERMINISTIC KANBAN SYSTEM [J].
BITRAN, GR ;
LI, C .
MANAGEMENT SCIENCE, 1987, 33 (04) :427-441
[9]  
Chaharsooghi SK, 2010, SCI IRAN TRANS E, V17, P143
[10]   Optimal production lot sizing with rework, scrap rate, and service level constraint [J].
Chiu, Singa Wang ;
Ting, Chia-Kuan ;
Chiu, Yuan-Shyi Peter .
MATHEMATICAL AND COMPUTER MODELLING, 2007, 46 (3-4) :535-549