共 50 条
- [31] AHP-Fuzzy Comprehensive Evaluation Method for Enterprise Technology Innovation Risk Assessment and Early Warning Research PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 23 - 27
- [32] The Warning Model Based on AHP-FUZZY for Engineering Transaction Costs TECHNICS TECHNOLOGIES EDUCATION MANAGEMENT-TTEM, 2011, 6 (01): : 78 - 82
- [34] Study on Risk Assessment of Pile Running for Large Diameter Piles Based on AHP-Fuzzy Method 1600, Editorial office of Ship Building of China, China (58):
- [35] A Quantitative Analysis of Lake Tourism Resource Value Based on AHP-fuzzy Comprehensive Evaluation Method ADVANCED MATERIALS AND ENGINEERING MATERIALS II, 2013, 683 : 809 - 814
- [36] Suitability Evaluation of Hydrogen Production and Hydrogenation Station Based on AHP-Fuzzy Comprehensive Evaluation Method Energy Engineering: Journal of the Association of Energy Engineering, 2022, 119 (04): : 1547 - 1567
- [37] Efficiency Evaluation Model of Power Transmission & Transformation Project Investment Based on AHP-Fuzzy Method THERMAL, POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 732-733 : 1303 - 1307
- [38] Competitiveness Evaluation of China Chain Retail Enterprises Based on AHP-FUZZY 2013 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS (SOLI), 2013, : 160 - 165
- [39] Maturity evaluation for highway site standardization management based on AHP-FUZZY Lu, Y. (1075305368@qq.com), 1600, Advanced Institute of Convergence Information Technology, Myoungbo Bldg 3F,, Bumin-dong 1-ga, Seo-gu, Busan, 602-816, Korea, Republic of (04): : 557 - 564
- [40] Synthetic evaluation for urban rail transit line network planning scheme based on AHP-fuzzy method Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2007, 31 (02): : 205 - 208