Research on the Distribution of Frozen soil in Naqu Region Based on the AHP-Fuzzy Method

被引:1
作者
Lv Xuehai [1 ]
Qin Chengyun [2 ]
Liu Teng [2 ]
Chen Zhongguo [1 ]
Yan Jubin [1 ]
机构
[1] Chengdu Chengdian Elect Power Engn Design Co Ltd, State Grid Sichuan Econ Res Inst, Chengdu 610059, Sichuan, Peoples R China
[2] Chengdu Univ Technol, State Key Lab Geohazard Prevent & Geoenvironm Pro, Chengdu 610059, Sichuan, Peoples R China
来源
4TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING | 2019年 / 237卷
关键词
D O I
10.1088/1755-1315/237/3/032003
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The Central Tibet Power Grid project, a high-level transmission line construction project in the Qinghai-Tibet Plateau, stretches over the Naqu region of Tibet with different types of frozen soil distribution. The design, construction and safe operation of the project are seriously affected by the distribution of frozen soil. Based on elevation data, this paper adopted the AHP-Fuzzy comprehensive numerical model as the theoretical research method to make a statistical analysis of the relevant factors affecting the frozen soil distribution. The research was completed with the help of GIS technology. The results show that the AHP-Fuzzy method is feasible for the study of regional frozen soil distribution; that the elevation and temperature are the main factors controlling the distribution of frozen soil in Naqu area; that the permafrost in Naqu area is mainly distributed in the northwest and southwest regions; that the frozen soil is distributed in the low-altitude areas of the central part; that the degradation of frozen soil has occurred in the eastern part of the country due to the rising temperature. The research results will pave way for the future route planning and design of the tower-based network project.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] AHP-Fuzzy Comprehensive Evaluation Method for Enterprise Technology Innovation Risk Assessment and Early Warning Research
    Xing Liman
    Ma Ling
    Li Yanhong
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 23 - 27
  • [32] The Warning Model Based on AHP-FUZZY for Engineering Transaction Costs
    Zhang Yi
    Wang Zhuo-Fu
    Liu Xun
    TECHNICS TECHNOLOGIES EDUCATION MANAGEMENT-TTEM, 2011, 6 (01): : 78 - 82
  • [33] Evaluation of the elderly health examination app based on the comprehensive evaluation method of AHP-fuzzy theory
    Xia, Lu-Ting
    Ho, Chun-Heng
    Lin, Xing-Min
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2021, 18 (04) : 4731 - 4742
  • [34] Study on Risk Assessment of Pile Running for Large Diameter Piles Based on AHP-Fuzzy Method
    1600, Editorial office of Ship Building of China, China (58):
  • [35] A Quantitative Analysis of Lake Tourism Resource Value Based on AHP-fuzzy Comprehensive Evaluation Method
    Zeng Yan
    Bao Xiangping
    ADVANCED MATERIALS AND ENGINEERING MATERIALS II, 2013, 683 : 809 - 814
  • [36] Suitability Evaluation of Hydrogen Production and Hydrogenation Station Based on AHP-Fuzzy Comprehensive Evaluation Method
    Zhang S.
    Xue J.
    Sun X.
    Energy Engineering: Journal of the Association of Energy Engineering, 2022, 119 (04): : 1547 - 1567
  • [37] Efficiency Evaluation Model of Power Transmission & Transformation Project Investment Based on AHP-Fuzzy Method
    Tian, Guishen
    Liu, Jicheng
    Zhou, Jingjing
    Liu, Junli
    Li, Bing
    THERMAL, POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 732-733 : 1303 - 1307
  • [38] Competitiveness Evaluation of China Chain Retail Enterprises Based on AHP-FUZZY
    Wang, Chongcai
    Zhang, Mingli
    Tu, Jianbo
    2013 IEEE INTERNATIONAL CONFERENCE ON SERVICE OPERATIONS AND LOGISTICS, AND INFORMATICS (SOLI), 2013, : 160 - 165
  • [39] Maturity evaluation for highway site standardization management based on AHP-FUZZY
    Lu, Yang
    Wang, Mengjun
    Zhang, Zhensen
    Lu, Y. (1075305368@qq.com), 1600, Advanced Institute of Convergence Information Technology, Myoungbo Bldg 3F,, Bumin-dong 1-ga, Seo-gu, Busan, 602-816, Korea, Republic of (04): : 557 - 564
  • [40] Synthetic evaluation for urban rail transit line network planning scheme based on AHP-fuzzy method
    Li, Junfang
    Wu, Xiaoping
    Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2007, 31 (02): : 205 - 208