EFFECT OF HUMAN FACTOR PERFORMANCE ON THE PRODUCTIVITY OF A MANUAL ASSEMBLY LINE

被引:6
|
作者
Vilela, F. F. [1 ]
Leal, F. [1 ]
Montevechi, J. A. B. [1 ]
Piedade, D. D. C. [2 ]
机构
[1] Univ Fed Itajuba, Inst Prod Engn & Management, Itajuba, Brazil
[2] Univ Fed Ouro Preto, Inst Exact & Appl Sci, Joao Monlevade, Brazil
关键词
Discrete Event Simulation; Human Factor Performance; Manual Assembly Line; Simulation Model Reliability; SLEEP-DEPRIVATION; DECISION-MAKING; SIMULATION; MODEL;
D O I
10.2507/IJSIMM19-3-508
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To improve the reliability of the discrete event simulation model, it is necessary to represent, the best way possible, the operator behaviour and his subsequent performance. Deterministic simulation models often overestimate the production capacity of manufacturing systems since they don't consider some key relationships, such as the impact of human factor performance on productivity. This paper, with the aid of statistical techniques, analyses the total of boards produced, taking into consideration different periods of work shifts to apprehend the variability of human performance at different points throughout the day. Therefore, this paper aims to investigate the impact of human performance on the work shift and, hence, on the computer model's validity. Results reveal that human performance has a significant impact on the productivity of the assembly line investigated and affected the reliability of production forecasts through stochastic simulation.
引用
收藏
页码:365 / 374
页数:10
相关论文
共 50 条
  • [21] Manual assembly cells vs. sequential line
    Berdyshevski, Alexander
    AUSTRALIAN JOURNAL OF MECHANICAL ENGINEERING, 2016, 14 (03) : 212 - 216
  • [22] Investigation of Part Feeding Problems in Manual Assembly Line
    Kumnuch, Nareerat
    Prombanpong, Suksan
    2015 3RD ASIA CONFERENCE ON MECHANICAL AND MATERIALS ENGINEERING (ACMME 2015), 2015, 26
  • [23] Optimizing ergonomic in manual assembly line balancing problem
    Tkitek, Zainab
    Triki, Hager
    2022 INTERNATIONAL CONFERENCE ON DECISION AID SCIENCES AND APPLICATIONS (DASA), 2022, : 842 - 845
  • [24] An Empirical Analysis of the Effect of Total Factor Productivity on Manufacturing Performance
    Zhang, Hongbo
    Wu, Jianyuan
    Zhong, Nian
    PROCEEDINGS OF THE 2018 3RD INTERNATIONAL CONFERENCE ON MODELLING, SIMULATION AND APPLIED MATHEMATICS (MSAM 2018), 2018, 160 : 273 - 276
  • [25] KEY TO INCREASED PRODUCTIVITY - MANUAL FOR LINE EXECUTIVES - RUDGE,F
    REYNIERSE, JH
    PERSONNEL PSYCHOLOGY, 1977, 30 (04) : 738 - 739
  • [26] Human-centered performance management in manual assembly - The impact of gamified KPI provision on performance and motivation
    Ohlig, Jasmin
    Hellebrandt, Thomas
    Potters, Patrick
    Heine, Ina
    Schmitt, Robert H.
    Leyendecker, Bert
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2023, 36 (01) : 51 - 69
  • [27] Enhancing productivity in manual electronics assembly and inspection through illumination design
    Quintana, Rolando
    Leung, Mark T.
    Chen, An-Sing
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2008, 57 (04) : 297 - +
  • [28] PROBABILISTIC ANALYSIS OF STRUCTURAL RELIABILITY AND PRODUCTIVITY OF ASSEMBLY LINE AND AUTOMATED LINE
    ZAK, YA
    AVTOMATIKA, 1991, (03): : 87 - 93
  • [29] Human cognition in manual assembly: Theories and applications
    Stork, Sonja
    Schuboe, Anna
    ADVANCED ENGINEERING INFORMATICS, 2010, 24 (03) : 320 - 328
  • [30] An approach to predict human reliability in manual assembly
    Guennel, B.
    Schlummer, M.
    Meyna, A.
    Schick, M.
    Heumeni, F.
    Haueis, M.
    ADVANCES IN SAFETY, RELIABILITY AND RISK MANAGEMENT, 2012, : 610 - 617