Integrated production, statistical process control, and maintenance policy for unreliable manufacturing systems

被引:47
作者
Bahria, Nadia [1 ]
Chelbi, Anis [2 ]
Bouchriha, Hanen [1 ]
Dridi, Imen Harbaoui [1 ]
机构
[1] Univ Tunis El Manar, ENIT, Lab Anal Conception & Commande Syst LACS, Tunis, Tunisia
[2] Univ Tunis, ENSIT, Ctr Rech Prod CEREP, Tunis, Tunisia
关键词
batch manufacturing systems; control chart; buffer stock; preventive and corrective maintenance; integrated production-quality-maintenance policies; perfect maintenance; PREVENTIVE MAINTENANCE; JOINT OPTIMIZATION; CONTROL CHART; QUALITY; DESIGN; MODEL; INVENTORY; SCHEDULE; MACHINE;
D O I
10.1080/00207543.2018.1530472
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The objective of this paper is to develop an integrated approach for the joint control of production, maintenance and quality for batch manufacturing systems. We consider such systems that are subject to degradation which is at the origin of the production of defective units. The quality control of lots produced is performed using an 'x-bar' control chart. This graphical tool will allow estimating the quality of the batch being produced and possibly undertake perfect preventive or corrective maintenance actions on the production system. A buffer stock is built to maintain continuity of supply during maintenance actions. The incurred total cost includes setup cost, inventory costs, the cost of unused products, maintenance costs and quality costs. Decision variables include the buffer stock size, the sample size, the sampling interval, the surveillance and the control limits of the control chart. Numerical experiments and sensitivity analyses are provided to evaluate the effectiveness of the proposed control policy and the robustness of the solving approach.
引用
收藏
页码:2548 / 2570
页数:23
相关论文
共 42 条
[1]  
[Anonymous], 2007, IIE T, DOI DOI 10.1080/
[2]  
[Anonymous], 2004, INTRO STAT QUALITY C
[3]   Preventive maintenance (PM) planning: A review [J].
Basri E.I. ;
Razak I.H.A. ;
Ab-Samat H. ;
Kamaruddin S. .
Journal of Quality in Maintenance Engineering, 2017, 23 (02) :114-143
[4]   The economic production lot-sizing problem with imperfect production processes and imperfect maintenance [J].
Ben-Daya, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 76 (03) :257-264
[5]   Effect of maintenance on the economic design of (x)over-bar-control chart [J].
Ben-Daya, M ;
Rahim, MA .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 120 (01) :131-143
[6]  
Ben-Daya M., 1995, Journal of Quality in Maintenance Engineering, V1, P20, DOI [10.1108/13552519510083110, DOI 10.1108/13552519510083110]
[7]   Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint [J].
Bouslah, B. ;
Gharbi, A. ;
Pellerin, R. .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 61 :110-126
[8]   Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system [J].
Bouslah, Bassem ;
Gharbi, Ali ;
Pellerin, Robert .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 144 (01) :143-156
[9]  
Budai G, 2008, SPRINGER SER RELIAB, P321, DOI 10.1007/978-1-84800-011-7_13
[10]   Joint determination of optimal safety stocks and production policy for an imperfect production system [J].
Chakraborty, T. ;
Giri, B. C. .
APPLIED MATHEMATICAL MODELLING, 2012, 36 (02) :712-722